Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock levellers · Buckinghamshire

Swing-lip dock levellers in Buckinghamshire

For swing-lip dock levellers in Buckinghamshire, you deal with one specialist who looks at the site, agrees the scope and manages the engineers who carry out the work. Towns covered include Milton Keynes, High Wycombe, Aylesbury and Bletchley.

Guide £5,200–£8,800 per leveller ex VATFree site surveyEngland
Hydraulic swing-lip dock leveller sloping into the back of a curtain-sider trailer
In short

A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.

What should sites in Buckinghamshire consider?

Should a recent insurance inspection at a site in Buckinghamshire have flagged leveller defects, a survey can show whether repair or replacement makes more sense. Distribution warehouses in Buckinghamshire loading curtain-siders and box trailers every day are typical users of swing-lip levellers, which handle routine pallet loading well.

Ageing levellers in older docks around Buckinghamshire can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound.

Any project involving swing-lip dock levellers at a working site in Buckinghamshire takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.

How long should a dock leveller platform be?

A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.

  • Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
  • Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
  • Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
  • Width: a wider platform gives more room when pallets sit close to the trailer sides.

When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.

Do dock levellers have to be inspected by law?

Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.

  • Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
  • Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
  • Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
  • LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
  • Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.

Our inspection guide explains what an examiner looks at.

Towns we cover in Buckinghamshire

Find your town in the list below for details of swing-lip dock levellers across Buckinghamshire, or contact us if your location is not shown.

Guide price
£5,200–£8,800 per leveller, ex VAT

Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.

Which rules apply in England?

Workplace safety in England is regulated by HSE. For a loading bay in Buckinghamshire, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.

Questions

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Buckinghamshire site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Is VAT included in your guide prices for swing-lip dock levellers?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Buckinghamshire as everywhere else: for swing-lip dock levellers, it is £5,200 to £8,800 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Can a swing-lip leveller be used as a ramp to the yard?

No, a leveller should only be used to bridge a docked trailer. The lip and toe guards are designed to work with a trailer bed in place, and the platform is not built as a ramp down to yard level. Where you need ground-level access, a separate door or a lift table is the safer answer.

Can a new leveller fit our old pit?

Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.

Other services in Buckinghamshire

Full guide to swing-lip dock levellers · All loading bay services in Buckinghamshire

Call freeGet a quote