- Location
- Newburn, Tyne and Wear
- Main postcode district
- NE15
- Nearby (straight line)
- Blaydon-on-Tyne (2 miles), Whickham (4 miles) and Gosforth (5 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Where does this fit at a dock in Newburn?
Food, drink and pharmaceutical sites around Newburn that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism. Sites in Newburn replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.
Older industrial buildings in Newburn built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.
We do not give a fixed price without seeing the site. A free survey in Newburn lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.
Should a dock lift be pit-mounted or surface-mounted?
A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.
- Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
- Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.
Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.
How much does a scissor lift table cost?
A scissor lift table for a loading bay typically costs £9,500 to £28,000 per lift, supplied and installed, excluding VAT. Smaller surface-mounted lifts sit towards the lower end; large, high-capacity pit lifts with gates and bridge plates sit towards the top.
What moves the price:
- Capacity: dock lifts are typically rated somewhere between 2,000 and 6,000 kg, and heavier ratings need a stronger mechanism.
- Platform size and travel: larger platforms and greater lift heights cost more.
- Mounting: pit-mounted or surface-mounted with a ramp.
- Safety equipment: bellows or skirts, toe guards, rails, gates and bridge plates.
- Electrics and access: supply to the power pack, delivery access and out-of-hours working.
Forming a pit, drainage and other groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Lighting inside trailers and at the dock face
- Wheel guide positions and yard markings for reversing vehicles
- Gaps around trailers where heated or chilled air escapes
- How often each door cycles during a typical shift
- Control positions, isolators and any existing interlocks
- Bumper position and wear or damage on the dock face
Options to discuss
Surface-mounted lift table
Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.
Pit-mounted dock lift
Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.
Planning, building control and safety law in England
Workplace safety in England is regulated by HSE. For a loading bay in Newburn, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about scissor lift tables in Newburn
Can you work outside our normal operating hours in Newburn?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Can you work alongside our main contractor on a new build in Newburn?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Will you deal with building control and planning for a project in Newburn?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can a scissor lift table be installed outdoors?
Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Scissor lift tables near Newburn
Close neighbours of Newburn with their own pages here: Blaydon-on-Tyne (2 miles), Whickham (4 miles) and Gosforth (5 miles). Choose one to see coverage details for that town.
Other loading bay services in Newburn
Full guide to scissor lift tables · Everything we do in Newburn
Ready to talk about a loading bay in Newburn? Call us, or send the details through the quote form.
