Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Loughborough

Scissor lift tables in Loughborough

From a single bay to a full row of docks, we can help with scissor lift tables in Loughborough and at sites elsewhere in Leicestershire.

Guide £9,500–£28,000 per lift ex VATFree site surveyLE11
Location
Loughborough, Leicestershire
Main postcode district
LE11
Nearby (straight line)
Mountsorrel (4 miles), Coalville (8 miles) and Castle Donington (8 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

Why do sites in Loughborough choose this?

Where ground conditions in Loughborough make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option. Split-level buildings near Loughborough sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps.

Town-centre and retail sites around Loughborough with little yard space often choose a dock lift because a recessed approach ramp would take up too much room.

We keep the process simple for sites in Loughborough. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

How much does a scissor lift table cost?

A scissor lift table for a loading bay typically costs £9,500 to £28,000 per lift, supplied and installed, excluding VAT. Smaller surface-mounted lifts sit towards the lower end; large, high-capacity pit lifts with gates and bridge plates sit towards the top.

What moves the price:

  • Capacity: dock lifts are typically rated somewhere between 2,000 and 6,000 kg, and heavier ratings need a stronger mechanism.
  • Platform size and travel: larger platforms and greater lift heights cost more.
  • Mounting: pit-mounted or surface-mounted with a ramp.
  • Safety equipment: bellows or skirts, toe guards, rails, gates and bridge plates.
  • Electrics and access: supply to the power pack, delivery access and out-of-hours working.

Forming a pit, drainage and other groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.

Guide price, Loughborough
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Clear opening width and height for each door
  • Escape routes and pedestrian doors close to the bay
  • Dock height and the mix of trailers you load
  • Scope to convert ground-level doors into docks or add lift tables
  • Yard gradient and the slope of the approach to the dock
  • Gaps around trailers where heated or chilled air escapes

Options to discuss

Pit-mounted dock lift

Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.

Safety bellows and skirts

A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.

Which rules apply in England?

Lift tables and dock lifts in Loughborough may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about scissor lift tables in Loughborough

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Loughborough site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Is the site survey in Loughborough free?

Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.

How long does installation take at a site in Loughborough?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

Does a scissor lift table need a pit?

No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.

Scissor lift tables near Loughborough

The same survey, quote and repair service is available in towns around Loughborough, such as Mountsorrel (4 miles), Coalville (8 miles) and Castle Donington (8 miles).

Other loading bay services in Loughborough

Full guide to scissor lift tables · Everything we do in Loughborough

Use the quote tool to tell us about the doors, levellers or shelters at your Loughborough site, and we will be in touch to arrange the next step.

Call freeGet a quote