Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Eastleigh

Scissor lift tables in Eastleigh

A clear scope, an agreed plan and a single contact who manages the work: that is what sites in Eastleigh can expect when they come to us for help with scissor lift tables.

Guide £9,500–£28,000 per lift ex VATFree site surveySO50
Location
Eastleigh, Hampshire
Main postcode district
SO50
Nearby (straight line)
Bishopstoke (1 mile), Hedge End (4 miles) and Southampton (5 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

Why do sites in Eastleigh choose this?

Each lift table enquiry from Eastleigh is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately. Where ground conditions in Eastleigh make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option.

Older industrial buildings in Eastleigh built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.

Your loading bay stays our responsibility from the survey to the handover. In Eastleigh, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.

What inspections does a scissor lift table need under LOLER?

A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.

In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.

Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.

We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

Guide price, Eastleigh
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Asbestos register and any other site hazard information
  • Forklift and pallet truck loads crossing the leveller platform
  • Age and condition of the equipment already in place
  • How often each door cycles during a typical shift
  • Bumper position and wear or damage on the dock face
  • Escape routes and pedestrian doors close to the bay

Options to discuss

Pit-mounted dock lift

Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.

Bridge plate

A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.

Which rules apply in England?

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Eastleigh. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about scissor lift tables in Eastleigh

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Eastleigh, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

How do you price scissor lift tables for a site in Eastleigh?

Guide budgets for supply and fit are £9,500 to £28,000 per lift, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

Can you work alongside our main contractor on a new build in Eastleigh?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

How often does a lift table need servicing?

A lift table needs routine maintenance as well as its LOLER thorough examinations. Many sites combine the two so the lift is serviced shortly before each examination. The right maintenance frequency depends on how heavily the lift is used, and we agree it with you at handover.

Scissor lift tables near Eastleigh

Looking beyond Eastleigh? Our pages for Bishopstoke (1 mile), Hedge End (4 miles) and Southampton (5 miles) describe the same loading bay services and how to get in touch.

Other loading bay services in Eastleigh

Full guide to scissor lift tables · Everything we do in Eastleigh

Have photos of the door, leveller or shelter? Send them with your enquiry and we can give a clearer answer for your Eastleigh site.

Call freeGet a quote