Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · March

Scissor lift tables in March

We offer help with scissor lift tables to businesses in March and across Cambridgeshire, whether the bay handles a few deliveries a week or trailers around the clock.

Guide £9,500–£28,000 per lift ex VATFree site surveyPE15
Location
March, Cambridgeshire
Main postcode district
PE15
Nearby (straight line)
Wisbech (8 miles), Ely (13 miles) and Peterborough (14 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

How does this suit sites in March?

Older industrial buildings in March built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard. Sites in March replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.

Town-centre and retail sites around March with little yard space often choose a dock lift because a recessed approach ramp would take up too much room.

Any project involving scissor lift tables at a working site in March takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.

Should a dock lift be pit-mounted or surface-mounted?

A pit-mounted dock lift is best where pallet trucks need to roll straight on at ground level, while a surface-mounted lift suits sites where digging a pit is impractical or the lift may move later. Both raise goods to trailer height; the difference is how you get on at the bottom.

  • Pit-mounted: the lift sits in a concrete pit so the platform is flush with the yard when lowered. Pallet trucks drive straight on. The pit needs drainage, and forming it is a structural job that may need building control approval.
  • Surface-mounted: the lift stands on the existing floor and a short ramp leads on to the platform at its lowest height. No excavation, quicker to install and easier to relocate, but the ramp takes space and can be harder work with heavy loads.

Ground conditions, drainage, available space and the weight of your typical load usually decide it. We set out both options at survey where either would work.

What inspections does a scissor lift table need under LOLER?

A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.

In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.

Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.

We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.

Guide price, March
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Gaps around trailers where heated or chilled air escapes
  • How often each door cycles during a typical shift
  • Yard gradient and the slope of the approach to the dock
  • Whether planning, building control or a building warrant may be needed
  • Working hours, shift patterns and windows for out-of-hours work
  • Age and condition of the equipment already in place

Options to discuss

Safety bellows and skirts

A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.

Bridge plate

A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.

Regulations and approvals in England

Lift tables and dock lifts in March may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about scissor lift tables in March

How long does installation take at a site in March?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can you work outside our normal operating hours in March?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

How do you price scissor lift tables for a site in March?

Guide budgets for supply and fit are £9,500 to £28,000 per lift, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

Can a scissor lift table be installed outdoors?

Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.

How often does a lift table need servicing?

A lift table needs routine maintenance as well as its LOLER thorough examinations. Many sites combine the two so the lift is serviced shortly before each examination. The right maintenance frequency depends on how heavily the lift is used, and we agree it with you at handover.

Scissor lift tables near March

Distances are measured from March. Nearby towns we cover include Wisbech (8 miles), Ely (13 miles) and Peterborough (14 miles), and other towns in the area are covered too.

Other loading bay services in March

Full guide to scissor lift tables · Everything we do in March

Phone us to discuss your loading bay in March, or start with the online quote tool if you prefer to send details first.

Call freeGet a quote