A retractable dock shelter is a fabric shelter fixed to the building around a loading bay door, with flexible top and side curtains carried on a sprung or pantograph steel frame. When a trailer reverses in, the frame retracts and the curtains drape against the trailer's sides and roof, closing most of the gap while leaving the full width of the trailer opening clear for loading.
Is this right for your site in Somerset?
Third-party logistics sites in Somerset receiving trailers from many hauliers usually need a shelter rather than a seal, because widths and heights vary. Retail and e-commerce distribution centres in Somerset with high trailer turnover need tough sprung-frame shelters that recover quickly after each departure.
If a shelter on an older unit in Somerset has a sound frame but torn, faded curtains, replacing just the curtains can be the economical choice.
Keeping the dock running is usually the first concern, so we plan around it. After a free survey of your Somerset site and a written quote at a fixed price, we agree when each bay can be released and whether any work should happen out of hours. Specialist installation engineers working under our management then fit the equipment, and we test it and hand over the documentation before the bay goes back into use.
What regulations and permissions apply to a dock shelter?
A dock shelter is work equipment, so it must be suitable and kept in a safe condition, and on some projects planning, building control or landlord consent also needs checking. What applies depends on the nation and the scope of work.
- Equipment duties: PUWER 1998 in Great Britain, and PUWER (Northern Ireland) 1999, require shelters, like other dock equipment, to be suitable, maintained and inspected where deterioration could lead to danger. A damaged frame or loose curtain can strike a driver or vehicle.
- Regulator: HSE in Great Britain and HSENI in Northern Ireland.
- Planning: external structures such as loading houses, canopies or new dock approaches can need planning permission. If a shelter is part of wider external works, we check this at survey.
- Building control: forming a new opening for a door and shelter may need Building Regulations approval in England and Wales, a building warrant in Scotland or building control approval in Northern Ireland.
- Your lease: landlords often require consent for fixings to the building.
How is a retractable dock shelter installed?
A retractable shelter is fixed to the outside face of the building around the dock door, working from powered access equipment in the yard. A single shelter usually takes a few hours to a day, depending on its size and the wall it fixes to.
- The wall is checked for fixing points; on cladding, a steel subframe or spreader plates are often needed.
- The frame is fixed and set level, centred on the door and leveller.
- Top and side curtains are hung and trimmed to meet the trailers you receive.
- Bumpers are checked, since they set how far the trailer pushes into the shelter.
- The shelter is tested with a trailer reversing in where possible.
You will need to keep the yard area in front of the bay clear for access equipment and take the bay out of use during fitting. No power supply is needed, and neighbouring bays can keep working while each shelter goes up.
Towns we cover in Somerset
We provide retractable dock shelters right across Somerset. Pick the town closest to your site from the list below.
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
Planning, building control and safety law in England
Workplace safety in England is regulated by HSE. For a loading bay in Somerset, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions
Can you work alongside our main contractor on a new build in Somerset?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
How do you price retractable dock shelters for a site in Somerset?
Guide budgets for supply and fit are £1,900 to £4,400 per shelter, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
Can I replace just the curtains on an old shelter?
Yes, if the frame and fixings are sound, new top and side curtains can be fitted to an existing shelter, which is often the most economical way to restore it. The frame and springs are checked first, because new curtains on a failing frame will not last. This is handled as a repair, with the visit price agreed beforehand.
Does a dock shelter keep a building warm?
A shelter reduces the draughts and rain entering the dock around a trailer, which helps keep the loading area warmer. It does not seal as closely as a dock seal or inflatable shelter, so for chilled and frozen docks those options are usually preferred.
Other services in Somerset
Full guide to retractable dock shelters · All loading bay services in Somerset

