A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
What should sites in Warwick consider?
Units in Warwick with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house. For older buildings in Warwick with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.
Where a yard in Warwick is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.
Your loading bay stays our responsibility from the survey to the handover. In Warwick, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.
When is a loading house better than an internal dock?
A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.
- No room inside: racking, production lines or mezzanines sit right up to the wall.
- Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
- Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
- Security: the building can be closed at the wall line while the house itself stays open to the yard.
- Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.
Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Wheel guide positions and yard markings for reversing vehicles
- Forklift and pallet truck loads crossing the leveller platform
- Temperature requirements for chilled, frozen or ambient goods
- Whether planning, building control or a building warrant may be needed
- Yard gradient and the slope of the approach to the dock
- Wind exposure at the dock, which affects door and shelter choice
Options to discuss
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Which rules apply in England?
Lift tables and dock lifts in Warwick may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about loading houses in Warwick
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Warwick site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Can you work alongside our main contractor on a new build in Warwick?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Can you work outside our normal operating hours in Warwick?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Is a loading house cheaper than forming an internal pit?
Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Loading houses near Warwick
If your site is not in Warwick itself, it may be near one of these: Royal Leamington Spa (3 miles), Kenilworth (5 miles) and Stratford-upon-Avon (8 miles). Pick the closest.
Other loading bay services in Warwick
Full guide to loading houses · Everything we do in Warwick
Tell us what is happening at your Warwick dock, what equipment is there and when it is used, and we will suggest the right next step.