- Location
- Stratford-upon-Avon, Warwickshire
- Main postcode district
- CV37
- Nearby (straight line)
- Warwick (8 miles), Royal Leamington Spa (10 miles) and Kenilworth (12 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
What should sites in Stratford-upon-Avon consider?
Any loading house proposed in Stratford-upon-Avon needs its planning and building control position checked, which we look at during the site survey before quoting. Racked warehouses around Stratford-upon-Avon that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
For older buildings in Stratford-upon-Avon with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.
A single contact at Loading Bay Doors handles your project in Stratford-upon-Avon from start to finish. The free site survey and fixed written quote come first, with no obligation to proceed. We then book the installation for times that suit the operation, including out of hours by arrangement, and manage the specialist engineers on site. At the end we commission and test the equipment, walk your team through it and provide the documentation.
What happens on site when a loading house is installed?
Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.
- Foundations: concrete pads or footings are formed in the yard and left to cure.
- Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
- Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
- Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
- Commissioning: everything is tested with a trailer before handover.
We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.
What is a loading house made of?
A loading house is a steel frame clad in insulated composite panels, with a dock leveller built into its floor and a shelter or seal across its front. It is made to suit your building, trailers and yard rather than bought off the shelf.
- Frame: galvanised or painted steel, supported on legs or a sub-frame that sits on concrete foundations.
- Walls and roof: insulated composite panels, usually colour-matched to the building cladding, with guttering to carry rainwater away.
- Floor and leveller: a steel deck with a hydraulic swing-lip or telescopic-lip leveller set into it.
- Front: a retractable or inflatable shelter or a foam seal, with bumpers below to take trailer impact.
- Building door: an insulated sectional door in the original wall opening, closing the building when no trailer is docked.
- Extras: internal lighting, dock lights and traffic lights as required.
The insulated envelope reduces the heat or chill lost around the trailer compared with an open dock.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Whether planning, building control or a building warrant may be needed
- Working hours, shift patterns and windows for out-of-hours work
- Headroom above the opening and which track type will suit it
- Lighting inside trailers and at the dock face
- Wall and steel structure for door, shelter and bumper fixings
- Access for deliveries, cranes or lifting equipment during installation
Options to discuss
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
Angled loading house
Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.
What do the rules in England mean for the work?
Lift tables and dock lifts in Stratford-upon-Avon may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about loading houses in Stratford-upon-Avon
What details do you need from us to quote for loading houses?
To get started, send the site address in Stratford-upon-Avon, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Is VAT included in your guide prices for loading houses?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Warwickshire as everywhere else: for loading houses, it is £14,500 to £32,000 per house, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
How long does installation take at a site in Stratford-upon-Avon?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
What door is used with a loading house?
The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.
Loading houses near Stratford-upon-Avon
Distances are measured from Stratford-upon-Avon. Nearby towns we cover include Warwick (8 miles), Royal Leamington Spa (10 miles) and Kenilworth (12 miles), and other towns in the area are covered too.
Other loading bay services in Stratford-upon-Avon
Full guide to loading houses · Everything we do in Stratford-upon-Avon
Speak to us about your Stratford-upon-Avon loading bay. We will ask the right questions, then set out the next step clearly.