- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Is this right for your site in Haslemere?
Manufacturing businesses around Haslemere adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside. Racked warehouses around Haslemere that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
Chilled stores near Haslemere sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.
Here is what happens after you contact us about a site in Haslemere. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.
How much does a loading house cost?
A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.
What moves the price:
- Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
- Foundations: ground conditions and buried services decide the size of pads or footings.
- Building works: forming or enlarging the wall opening, and a new insulated door if needed.
- Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.
These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- How often each door cycles during a typical shift
- Forklift and pallet truck loads crossing the leveller platform
- Whether planning, building control or a building warrant may be needed
- Clear opening width and height for each door
- Dock height and the mix of trailers you load
- How drivers are prevented from pulling away too early
Options to discuss
Angled loading house
Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
What do the rules in England mean for the work?
Workplace safety in England is regulated by HSE. For a loading bay in Haslemere, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about loading houses in Haslemere
How long does installation take at a site in Haslemere?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Haslemere site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Will you deal with building control and planning for a project in Haslemere?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Is a loading house cheaper than forming an internal pit?
Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Loading houses near Haslemere
The same survey, quote and repair service is available in towns around Haslemere, such as Bordon (7 miles), Godalming (8 miles) and Farnham (9 miles).
Other loading bay services in Haslemere
Full guide to loading houses · Everything we do in Haslemere
Use the quote tool to tell us about the doors, levellers or shelters at your Haslemere site, and we will be in touch to arrange the next step.