Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Frome

Loading houses in Frome

Talk to us about loading houses in Frome. We cover Somerset and can advise on the right approach for your doors, levellers, shelters and dock safety equipment.

Guide £14,500–£32,000 per house ex VATFree site surveyBA11
Location
Frome, Somerset
Main postcode district
BA11
Nearby (straight line)
Westbury (6 miles), Warminster (6 miles) and Trowbridge (8 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

How does this suit sites in Frome?

Units in Frome with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house. For older buildings in Frome with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.

Chilled stores near Frome sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.

We keep the process simple for sites in Frome. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.

What happens on site when a loading house is installed?

Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.

  1. Foundations: concrete pads or footings are formed in the yard and left to cure.
  2. Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
  3. Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
  4. Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
  5. Commissioning: everything is tested with a trailer before handover.

We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Guide price, Frome
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Escape routes and pedestrian doors close to the bay
  • Temperature requirements for chilled, frozen or ambient goods
  • Gaps around trailers where heated or chilled air escapes
  • Wall and steel structure for door, shelter and bumper fixings
  • Lighting inside trailers and at the dock face
  • Scope to convert ground-level doors into docks or add lift tables

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Planning, building control and safety law in England

Lift tables and dock lifts in Frome may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about loading houses in Frome

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Frome site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

How long does installation take at a site in Frome?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can you work outside our normal operating hours in Frome?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Can a loading house be moved later?

Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.

Loading houses near Frome

Distances are measured from Frome. Nearby towns we cover include Westbury (6 miles), Warminster (6 miles) and Trowbridge (8 miles), and other towns in the area are covered too.

Other loading bay services in Frome

Full guide to loading houses · Everything we do in Frome

Use the quote tool to tell us about the doors, levellers or shelters at your Frome site, and we will be in touch to arrange the next step.

Call freeGet a quote