Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Morecambe

Loading houses in Morecambe

Enquiries about loading houses from Morecambe go straight to our team, who will ask a few practical questions about the bay before arranging the next step with you.

Guide £14,500–£32,000 per house ex VATFree site surveyLA4
Location
Morecambe, Lancashire
Main postcode district
LA4
Nearby (straight line)
Heysham (2 miles), Lancaster (3 miles) and Fleetwood (12 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

What should sites in Morecambe consider?

Racked warehouses around Morecambe that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead. Developers bringing forward industrial units in Morecambe can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit.

For older buildings in Morecambe with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.

Your loading bay stays our responsibility from the survey to the handover. In Morecambe, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Guide price, Morecambe
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Bumper position and wear or damage on the dock face
  • Lighting inside trailers and at the dock face
  • Yard gradient and the slope of the approach to the dock
  • Scope to convert ground-level doors into docks or add lift tables
  • Dock height and the mix of trailers you load
  • Drainage on recessed or sloping dock approaches

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Angled loading house

Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.

Planning, building control and safety law in England

In England, Approved Document L (2021) sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. That shapes door specification for sites in Morecambe, so we confirm the requirement for your project and check what applies at survey before recommending a door.

Questions about loading houses in Morecambe

Can you work outside our normal operating hours in Morecambe?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Morecambe site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Will you deal with building control and planning for a project in Morecambe?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Loading houses near Morecambe

Distances are measured from Morecambe. Nearby towns we cover include Heysham (2 miles), Lancaster (3 miles) and Fleetwood (12 miles), and other towns in the area are covered too.

Other loading bay services in Morecambe

Full guide to loading houses · Everything we do in Morecambe

Use the quote tool to tell us about the doors, levellers or shelters at your Morecambe site, and we will be in touch to arrange the next step.

Call freeGet a quote