Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Radcliffe

Loading houses in Radcliffe

Getting loading houses right at a working dock in Radcliffe means thinking about the vehicles, the goods, the shift pattern and the people who use the bay.

Guide £14,500–£32,000 per house ex VATFree site surveyM26
Location
Radcliffe, Greater Manchester
Main postcode district
M26
Nearby (straight line)
Prestwich (3 miles), Bury (3 miles) and Walkden (4 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Where does this fit at a dock in Radcliffe?

Where a yard in Radcliffe is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall. Racked warehouses around Radcliffe that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Developers bringing forward industrial units in Radcliffe can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit.

It starts with a free site survey in Radcliffe, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.

When is a loading house better than an internal dock?

A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.

  • No room inside: racking, production lines or mezzanines sit right up to the wall.
  • Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
  • Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
  • Security: the building can be closed at the wall line while the house itself stays open to the yard.
  • Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.

Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.

What is a loading house made of?

A loading house is a steel frame clad in insulated composite panels, with a dock leveller built into its floor and a shelter or seal across its front. It is made to suit your building, trailers and yard rather than bought off the shelf.

  • Frame: galvanised or painted steel, supported on legs or a sub-frame that sits on concrete foundations.
  • Walls and roof: insulated composite panels, usually colour-matched to the building cladding, with guttering to carry rainwater away.
  • Floor and leveller: a steel deck with a hydraulic swing-lip or telescopic-lip leveller set into it.
  • Front: a retractable or inflatable shelter or a foam seal, with bumpers below to take trailer impact.
  • Building door: an insulated sectional door in the original wall opening, closing the building when no trailer is docked.
  • Extras: internal lighting, dock lights and traffic lights as required.

The insulated envelope reduces the heat or chill lost around the trailer compared with an open dock.

Guide price, Radcliffe
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Asbestos register and any other site hazard information
  • Scope to convert ground-level doors into docks or add lift tables
  • Age and condition of the equipment already in place
  • Gaps around trailers where heated or chilled air escapes
  • Power supply at each bay, including three-phase availability
  • Whether planning, building control or a building warrant may be needed

Options to discuss

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Regulations and approvals in England

Lift tables and dock lifts in Radcliffe may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about loading houses in Radcliffe

How do you price loading houses for a site in Radcliffe?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

Can you work alongside our main contractor on a new build in Radcliffe?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Will you deal with building control and planning for a project in Radcliffe?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Does a loading house need planning permission?

A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.

Can a loading house be moved later?

Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.

Loading houses near Radcliffe

Close neighbours of Radcliffe with their own pages here: Prestwich (3 miles), Bury (3 miles) and Walkden (4 miles). Choose one to see coverage details for that town.

Other loading bay services in Radcliffe

Full guide to loading houses · Everything we do in Radcliffe

Send a few photos of the dock and a short description of the problem, and we will come back to you about your Radcliffe site.

Call freeGet a quote