- Location
- Dundee, Dundee and Angus
- Main postcode district
- DD1
- Nearby (straight line)
- St Andrews (11 miles), Forfar (13 miles) and Arbroath (16 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Is this right for your site in Dundee?
Chilled stores near Dundee sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Units in Dundee with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.
Manufacturing businesses around Dundee adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.
We never ask you to commit before you have a fixed price. A free survey at your Dundee site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.
What happens on site when a loading house is installed?
Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.
- Foundations: concrete pads or footings are formed in the yard and left to cure.
- Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
- Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
- Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
- Commissioning: everything is tested with a trailer before handover.
We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.
When is a loading house better than an internal dock?
A loading house is usually the better option when the building floor is already at dock height but there is no practical way to form a leveller pit inside. It moves the whole dock outside the wall, leaving the internal floor clear.
- No room inside: racking, production lines or mezzanines sit right up to the wall.
- Difficult slab: the floor slab carries services or is unsuited to breaking out for a pit.
- Thermal control: the building door closes at the wall line, so the leveller sits outside the heated or chilled space when no trailer is docked.
- Security: the building can be closed at the wall line while the house itself stays open to the yard.
- Narrow yards: an angled house lets trailers approach on a diagonal and can fit more bays along one wall.
Where the building floor is at yard level, a loading house alone will not solve the height difference, and a recessed approach or lift table is usually needed instead.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Drainage on recessed or sloping dock approaches
- Access for deliveries, cranes or lifting equipment during installation
- Whether planning, building control or a building warrant may be needed
- Asbestos register and any other site hazard information
- Yard gradient and the slope of the approach to the dock
- How often each door cycles during a typical shift
Options to discuss
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
Regulations and approvals in Scotland
Lift tables at Scottish sites are lifting equipment under LOLER, which means thorough examination at least every 12 months, or every 6 months if people are lifted, depending on the equipment and its use. For a site in Dundee, your insurer or competent person will confirm the interval, and we check what applies at survey.
Questions about loading houses in Dundee
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Dundee, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Can you work outside our normal operating hours in Dundee?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Can you work alongside our main contractor on a new build in Dundee?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
Can a loading house be moved later?
Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.
Loading houses near Dundee
We also cover towns near Dundee, including St Andrews (11 miles), Forfar (13 miles) and Arbroath (16 miles). Each has its own page with the same services and process.
Other loading bay services in Dundee
Full guide to loading houses · Everything we do in Dundee
Request a quote for your loading bay in Dundee, attaching photos of the dock, the equipment and any damage.
