- Location
- Sevenoaks, Kent
- Main postcode district
- TN13
- Nearby (straight line)
- Tonbridge (6 miles), Royal Tunbridge Wells (10 miles) and Caterham (12 miles)
- Survey and quote
- Free, with a fixed written quote
An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.
What should sites in Sevenoaks consider?
Driving rain and wind at an open bay in Sevenoaks can wear cushion fabric, so a protective outer cover is worth considering on exposed docks. Fresh produce cooled at a packhouse in Sevenoaks stays colder during loading when the gap around the trailer is sealed by inflated cushions.
When a chilled dock in Sevenoaks sees condensation and ice around the door, the seal at the trailer is often where improvement starts.
Before anything is ordered, we visit your site in Sevenoaks for a free survey and then send a written quote with a fixed price. From that point we manage the installation, coordinating delivery, access and any other trades. Fitting is done by specialist installation engineers engaged and managed by us, at times that suit your operation, including out of hours where agreed. You get a tested installation, a demonstration for your team and the manufacturer documentation.
How does an inflatable shelter work with the dock door and leveller?
An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.
- The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
- The trailer is secured by restraint or key control, and the outside light shows red.
- The cushions inflate around the top and sides of the trailer.
- With the trailer sealed, the door opens and the leveller is deployed.
- After loading, the leveller is stored and the door closed.
- The cushions deflate and retract, and the light turns green.
Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.
What is involved in installing an inflatable dock shelter?
Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.
- The wall is checked and fixing points or a subframe prepared.
- The frame is fixed from powered access equipment in the yard.
- Top and side cushions are fitted, with protective covers where specified.
- The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
- Inflation, deflation and cushion retraction are tested with a trailer in the bay.
You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Whether planning, building control or a building warrant may be needed
- Headroom above the opening and which track type will suit it
- Escape routes and pedestrian doors close to the bay
- Forklift and pallet truck loads crossing the leveller platform
- Working hours, shift patterns and windows for out-of-hours work
- Dock height and the mix of trailers you load
Options to discuss
Interlocked controls
Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.
Protective outer covers
Hard-wearing covers over the cushions that shield the fabric from weather, sunlight and trailer contact, extending cushion life on exposed docks.
What do the rules in England mean for the work?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Sevenoaks. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about inflatable dock shelters in Sevenoaks
Is the site survey in Sevenoaks free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Will you deal with building control and planning for a project in Sevenoaks?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can you work alongside our main contractor on a new build in Sevenoaks?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Does an inflatable shelter work with containers and double-deck trailers?
Yes, provided the shelter is sized for the tallest and widest vehicles you receive. The cushions adapt to each vehicle's dimensions, which is a key reason inflatable shelters suit sites handling containers, standard trailers and double-deck units at the same bays.
Will we need to change the rest of the dock?
Usually not. Most inflatable shelters fit around an existing door opening, though the leveller, bumpers and door controls are reviewed so the cushions clear them and the interlocks work. Where the wall cannot carry the frame, a subframe is added. We confirm what is needed at survey.
Inflatable dock shelters near Sevenoaks
Nearby places we cover, measured from Sevenoaks, include Tonbridge (6 miles), Royal Tunbridge Wells (10 miles) and Caterham (12 miles). Ask if your own town is missing.
Other loading bay services in Sevenoaks
Full guide to inflatable dock shelters · Everything we do in Sevenoaks
For a written price on loading bay work in Sevenoaks, request a quote and include photos of the bay if you can.
