Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Shelters and seals · Gravesend

Inflatable dock shelters in Gravesend

For operators in Gravesend thinking about inflatable dock shelters, the starting point is a conversation about the site, the vehicles you load and how the bay is used day to day.

Guide £6,800–£12,800 per shelter ex VATFree site surveyDA12
Location
Gravesend, Kent
Main postcode district
DA12
Nearby (straight line)
Tilbury (2 miles), Grays (3 miles) and Strood (6 miles)
Survey and quote
Free, with a fixed written quote
Inflatable dock shelters, in short

An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.

Why do sites in Gravesend choose this?

Specifying a new temperature-controlled warehouse in Gravesend is the ideal time to design inflatable shelters in with the doors and levellers, so controls are integrated from the start. Fresh produce cooled at a packhouse in Gravesend stays colder during loading when the gap around the trailer is sealed by inflated cushions.

Frozen food stores in Gravesend loading trailers of varying sizes can use inflatable shelters to keep warm outside air away from the open door.

For inflatable dock shelters in Gravesend, we begin with a free site survey and a fixed written quote, so you know the scope and cost before committing. We take responsibility for managing the job, and specialist installation engineers carry it out under our supervision. Bays are taken out of use in a planned sequence so the rest of the dock keeps working, and evening or weekend work can be arranged. Each item is tested at handover and the documentation is left with you.

What is involved in installing an inflatable dock shelter?

Installing an inflatable shelter involves fixing a steel frame to the building around the dock door, mounting the cushions and fan, and wiring the controls, usually over one to two days per bay.

  1. The wall is checked and fixing points or a subframe prepared.
  2. The frame is fixed from powered access equipment in the yard.
  3. Top and side cushions are fitted, with protective covers where specified.
  4. The fan unit is mounted and the control panel wired, including interlocks to the door, leveller or restraint.
  5. Inflation, deflation and cushion retraction are tested with a trailer in the bay.

You will need to provide a clear yard area in front of the bay, take the bay out of use and arrange a power supply near the door, or ask us to include one. At cold stores we plan the work with the dock door kept closed, so the store stays at temperature while the shelter goes up outside.

How does an inflatable shelter work with the dock door and leveller?

An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.

  1. The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
  2. The trailer is secured by restraint or key control, and the outside light shows red.
  3. The cushions inflate around the top and sides of the trailer.
  4. With the trailer sealed, the door opens and the leveller is deployed.
  5. After loading, the leveller is stored and the door closed.
  6. The cushions deflate and retract, and the light turns green.

Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.

Guide price, Gravesend
£6,800–£12,800 per shelter, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Temperature requirements for chilled, frozen or ambient goods
  • Working hours, shift patterns and windows for out-of-hours work
  • Whether planning, building control or a building warrant may be needed
  • Gaps around trailers where heated or chilled air escapes
  • Control positions, isolators and any existing interlocks
  • How drivers are prevented from pulling away too early

Options to discuss

Interlocked controls

Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.

Three-sided inflatable

Top and side cushions that inflate around the trailer for the closest seal, the usual choice for chilled and frozen docks with mixed trailers.

Planning, building control and safety law in England

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Gravesend. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about inflatable dock shelters in Gravesend

Will you deal with building control and planning for a project in Gravesend?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Can you work alongside our main contractor on a new build in Gravesend?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Gravesend site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Do the cushions touch the trailer as it reverses in?

No, the cushions stay deflated and pulled back against the building while the trailer reverses in, so there is no rubbing as it docks. They inflate only once the trailer is in position and secured, which reduces wear on the fabric compared with foam seals and curtain shelters.

What happens to an inflatable shelter if the power fails?

If the power fails, the fan stops and the cushions gradually deflate, so the trailer can leave once loading has been brought to a safe end. At a cold store, the dock door should be closed by hand where possible to protect the store. We explain the power failure routine at handover.

Inflatable dock shelters near Gravesend

The same survey, quote and repair service is available in towns around Gravesend, such as Tilbury (2 miles), Grays (3 miles) and Strood (6 miles).

Other loading bay services in Gravesend

Full guide to inflatable dock shelters · Everything we do in Gravesend

Ready to talk about a loading bay in Gravesend? Call us, or send the details through the quote form.

Call freeGet a quote