Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock levellers · Gravesend

Swing-lip dock levellers in Gravesend

Businesses in Gravesend and the rest of Kent can come to us for swing-lip dock levellers, with one point of contact who stays with the job from first enquiry to sign-off.

Guide £5,200–£8,800 per leveller ex VATFree site surveyDA12
Location
Gravesend, Kent
Main postcode district
DA12
Nearby (straight line)
Tilbury (2 miles), Grays (3 miles) and Strood (6 miles)
Survey and quote
Free, with a fixed written quote
Swing-lip dock levellers, in short

A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.

Is this right for your site in Gravesend?

Ageing levellers in older docks around Gravesend can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound. Fitting out a new warehouse in Gravesend with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.

Distribution warehouses in Gravesend loading curtain-siders and box trailers every day are typical users of swing-lip levellers, which handle routine pallet loading well.

Before anything is ordered, we visit your site in Gravesend for a free survey and then send a written quote with a fixed price. From that point we manage the installation, coordinating delivery, access and any other trades. Fitting is done by specialist installation engineers engaged and managed by us, at times that suit your operation, including out of hours where agreed. You get a tested installation, a demonstration for your team and the manufacturer documentation.

How long should a dock leveller platform be?

A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.

  • Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
  • Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
  • Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
  • Width: a wider platform gives more room when pallets sit close to the trailer sides.

When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.

What wears out on a swing-lip dock leveller?

The lip hinge, hydraulic hoses and seals are usually the first parts to wear on a swing-lip leveller, and planned servicing finds most of these problems before they stop a bay.

  • Lip hinge: takes an impact every time the lip lands, and suffers badly if trailers reverse into a lip that has not been stored.
  • Hydraulics: hoses, cylinder seals and power pack oil age and can leak.
  • Velocity fuse: the safety valve that stops the platform dropping if a trailer pulls away must be tested.
  • Toe guards and maintenance strut: must be intact and working. HSE guidance notes guards or skirting may be needed where something could be caught.
  • Dock bumpers: worn bumpers let trailers strike the leveller and dock edge.

A leveller with a cracked lip hinge, a bent platform or repeated hydraulic leaks may be better replaced than repaired. Service and repair visits are chargeable and agreed before anyone attends.

Guide price, Gravesend
£5,200–£8,800 per leveller, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Working hours, shift patterns and windows for out-of-hours work
  • Power supply at each bay, including three-phase availability
  • Forklift and pallet truck loads crossing the leveller platform
  • Lighting inside trailers and at the dock face
  • Asbestos register and any other site hazard information
  • Escape routes and pedestrian doors close to the bay

Options to discuss

Insulated leveller

An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.

Interlocked controls

Control panels linked to the dock door, vehicle restraint or traffic lights so the leveller can only be operated when the dock is safe.

What do the rules in England mean for the work?

Lift tables and dock lifts in Gravesend may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about swing-lip dock levellers in Gravesend

Do you cover Gravesend for swing-lip dock levellers?

Yes. We take on swing-lip dock levellers for businesses in Gravesend and across Kent. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

What warranty comes with new loading bay equipment?

New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Gravesend site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.

Can you work outside our normal operating hours in Gravesend?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Do levellers need a three-phase supply?

Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.

Can a new leveller fit our old pit?

Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.

Swing-lip dock levellers near Gravesend

Looking beyond Gravesend? Our pages for Tilbury (2 miles), Grays (3 miles) and Strood (6 miles) describe the same loading bay services and how to get in touch.

Other loading bay services in Gravesend

Full guide to swing-lip dock levellers · Everything we do in Gravesend

Request a quote for your loading bay in Gravesend, attaching photos of the dock, the equipment and any damage.

Call freeGet a quote