Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Shelters and seals · Harringay

Inflatable dock shelters in Harringay

When you need inflatable dock shelters in Harringay or anywhere else in Greater London, we organise the job end to end and keep disruption to your loading operation as low as we can.

Guide £6,800–£12,800 per shelter ex VATFree site surveyN4, N8
Location
Harringay, Greater London
Main postcode districts
N4 and N8
Nearby (straight line)
Tottenham (2 miles), Walthamstow (3 miles) and Edmonton (3 miles)
Survey and quote
Free, with a fixed written quote
Inflatable dock shelters, in short

An inflatable dock shelter is a dock shelter with air-filled fabric cushions at the top and sides of the opening, kept deflated and close to the building until a trailer has reversed in. A fan then inflates the cushions so they press against the trailer roof and sides, giving a close seal that adapts to different trailer widths and heights, and deflates again before the trailer leaves.

What should sites in Harringay consider?

Frozen food stores in Harringay loading trailers of varying sizes can use inflatable shelters to keep warm outside air away from the open door. Fresh produce cooled at a packhouse in Harringay stays colder during loading when the gap around the trailer is sealed by inflated cushions.

Mixed fleets arriving at a cold store in Harringay, from rigids to double-deck trailers, are exactly the situation inflatable cushions are designed for.

Our part of the job in Harringay is to survey, quote and manage; the fitting itself is done by specialist installation engineers working under our management. The survey and the written quote are free. Once the fixed price is accepted, we agree dates that work around your deliveries and shifts, including out-of-hours working where needed. Every installation is tested before handover, and you receive the documentation for each item fitted.

What safety rules affect inflatable dock shelters?

An inflatable shelter is powered dock equipment, so it must be suitable, maintained and correctly marked, and it should be controlled so a trailer cannot pull away with the cushions inflated around it.

  • Work equipment: PUWER 1998 in Great Britain and PUWER (Northern Ireland) 1999 require it to be maintained in a safe condition and inspected where deterioration could lead to danger.
  • Marking: in Great Britain powered dock equipment may carry the UKCA or the CE mark. For Northern Ireland, the CE mark or CE with UKNI applies.
  • Drive-away: HSE workplace transport guidance (HSG136), followed by HSENI in Northern Ireland, calls for safeguards against drivers driving away too early, such as traffic lights, vehicle or trailer restraints, or keeping keys until it is safe. Linking deflation to these controls protects both the cushions and the driver.
  • Regulator: HSE in Great Britain and HSENI in Northern Ireland.

A vehicle restraint interlocked with the shelter and door is a common way to make the whole sequence dependable.

How does an inflatable shelter work with the dock door and leveller?

An inflatable shelter is the first step in the dock sequence: it seals around the trailer before the door opens and only deflates once the door has closed. Getting that order right is what makes it effective.

  1. The trailer reverses onto the bumpers, guided by dock lights and wheel guides.
  2. The trailer is secured by restraint or key control, and the outside light shows red.
  3. The cushions inflate around the top and sides of the trailer.
  4. With the trailer sealed, the door opens and the leveller is deployed.
  5. After loading, the leveller is stored and the door closed.
  6. The cushions deflate and retract, and the light turns green.

Deflated cushions must sit clear of the door and leveller, and internal straps or weights pull them back so trailers do not catch them. Interlocks make each step depend on the last, so staff cannot open the door onto an unsealed trailer.

Guide price, Harringay
£6,800–£12,800 per shelter, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Wheel guide positions and yard markings for reversing vehicles
  • Forklift and pallet truck loads crossing the leveller platform
  • How drivers are prevented from pulling away too early
  • Drainage on recessed or sloping dock approaches
  • Working hours, shift patterns and windows for out-of-hours work
  • Wind exposure at the dock, which affects door and shelter choice

Options to discuss

Top cushion only

A single inflatable cushion across the top of the opening, paired with fixed side pads or curtains, for docks where trailer heights vary more than widths.

Interlocked controls

Controls linked to the door, leveller and restraint so the shelter inflates before the door opens and deflates only once it has closed.

Regulations and approvals in England

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Harringay. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions about inflatable dock shelters in Harringay

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Harringay, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

How long does installation take at a site in Harringay?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Is VAT included in your guide prices for inflatable dock shelters?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Greater London as everywhere else: for inflatable dock shelters, it is £6,800 to £12,800 per shelter, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Does an inflatable shelter work with containers and double-deck trailers?

Yes, provided the shelter is sized for the tallest and widest vehicles you receive. The cushions adapt to each vehicle's dimensions, which is a key reason inflatable shelters suit sites handling containers, standard trailers and double-deck units at the same bays.

Do the cushions touch the trailer as it reverses in?

No, the cushions stay deflated and pulled back against the building while the trailer reverses in, so there is no rubbing as it docks. They inflate only once the trailer is in position and secured, which reduces wear on the fabric compared with foam seals and curtain shelters.

Inflatable dock shelters near Harringay

If your site is not in Harringay itself, it may be near one of these: Tottenham (2 miles), Walthamstow (3 miles) and Edmonton (3 miles). Pick the closest.

Other loading bay services in Harringay

Full guide to inflatable dock shelters · Everything we do in Harringay

Tell us what is happening at your Harringay dock, what equipment is there and when it is used, and we will suggest the right next step.

Call freeGet a quote