- Location
- Lancing, West Sussex
- Main postcode districts
- BN15 and BN43
- Nearby (straight line)
- Shoreham-by-Sea (2 miles), Worthing (2 miles) and Portslade (5 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in Lancing choose this?
Smaller distribution units in Lancing without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face. On older buildings in Lancing where drains or services run close to the dock, avoiding a pit can make an edge-of-dock leveller the sensible route.
If trailer heights at a site in Lancing vary widely, our survey will tell you plainly whether an edge-of-dock leveller can cope or a pit leveller is needed.
We do not give a fixed price without seeing the site. A free survey in Lancing lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Whether planning, building control or a building warrant may be needed
- Wheel guide positions and yard markings for reversing vehicles
- Scope to convert ground-level doors into docks or add lift tables
- Working hours, shift patterns and windows for out-of-hours work
- Wind exposure at the dock, which affects door and shelter choice
- Condition of any existing leveller pit, kerb angles and pit drainage
Options to discuss
Mechanical edge-of-dock leveller
Lever-operated with spring assistance and no power supply needed. Suits low-volume bays and sites with consistent trailers where simplicity matters most.
Wider or heavy-duty plate
A wider plate or higher rating for larger forklifts, heavy loads or pallet trucks with a wide wheel track, specified after we look at your equipment.
What do the rules in England mean for the work?
Lift tables and dock lifts in Lancing may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about edge-of-dock levellers in Lancing
Is VAT included in your guide prices for edge-of-dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in West Sussex as everywhere else: for edge-of-dock levellers, it is £1,800 to £4,400 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Which building and safety rules apply to a site in Lancing?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Lancing, we check what applies at survey and design to it.
Do you cover Lancing for edge-of-dock levellers?
Yes. We take on edge-of-dock levellers for businesses in Lancing and across West Sussex. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Can edge-of-dock levellers be used with vans?
Usually not. Edge-of-dock levellers are designed for trailers whose beds sit close to dock height, and many vans sit well below a typical dock, beyond the leveller's range. A lift table or a ground-level door is normally the better way to handle vans.
Edge-of-dock levellers near Lancing
We also cover towns near Lancing, including Shoreham-by-Sea (2 miles), Worthing (2 miles) and Portslade (5 miles). Each has its own page with the same services and process.
Other loading bay services in Lancing
Full guide to edge-of-dock levellers · Everything we do in Lancing
Ready to talk about a loading bay in Lancing? Call us, or send the details through the quote form.
