- Location
- Hawick, Scottish Borders
- Main postcode district
- TD9
- Nearby (straight line)
- Galashiels (13 miles) and Peebles (22 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in Hawick choose this?
Smaller distribution units in Hawick without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face. Tenants of leased warehouses in Hawick who cannot cut into the slab may find an edge-of-dock leveller the most workable way to improve loading.
On older buildings in Hawick where drains or services run close to the dock, avoiding a pit can make an edge-of-dock leveller the sensible route.
Before anything is ordered, we visit your site in Hawick for a free survey and then send a written quote with a fixed price. From that point we manage the installation, coordinating delivery, access and any other trades. Fitting is done by specialist installation engineers engaged and managed by us, at times that suit your operation, including out of hours where agreed. You get a tested installation, a demonstration for your team and the manufacturer documentation.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
Where does an edge-of-dock leveller work best?
An edge-of-dock leveller works best where trailer heights are consistent, a pit is impractical, or the budget rules out a pit leveller. It is a practical choice for many smaller operations and for adding capacity at larger ones.
- Leased units: where the lease or landlord does not allow a pit to be cut into the slab.
- Dedicated fleets: sites loading their own vehicles of a known bed height.
- Extra bays: adding loading positions at a dock where most bays already have pit levellers.
- Difficult slabs: where drainage, services or the structure would make a pit costly.
- Low-volume docks: occasional deliveries that do not justify a pit leveller.
Our guide on how to choose a dock leveller compares edge-of-dock, swing-lip and telescopic units in more detail, including the trailer and equipment questions to answer before deciding.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Working hours, shift patterns and windows for out-of-hours work
- How drivers are prevented from pulling away too early
- Drainage on recessed or sloping dock approaches
- Traffic routes for vehicles and separation of pedestrians
- Temperature requirements for chilled, frozen or ambient goods
- Headroom above the opening and which track type will suit it
Options to discuss
Wider or heavy-duty plate
A wider plate or higher rating for larger forklifts, heavy loads or pallet trucks with a wide wheel track, specified after we look at your equipment.
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
Planning, building control and safety law in Scotland
Lift tables at Scottish sites are lifting equipment under LOLER, which means thorough examination at least every 12 months, or every 6 months if people are lifted, depending on the equipment and its use. For a site in Hawick, your insurer or competent person will confirm the interval, and we check what applies at survey.
Questions about edge-of-dock levellers in Hawick
How long does installation take at a site in Hawick?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in Hawick, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
How do you price edge-of-dock levellers for a site in Hawick?
Guide budgets for supply and fit are £1,800 to £4,400 per leveller, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
Does the dock door still close with the leveller fitted?
Yes, in most layouts. Edge-of-dock levellers sit at the outer edge of the dock and store with the lip raised or folded, so the door closes behind them as normal. We check the clearance between the door, its bottom seal and the stored leveller at survey.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Edge-of-dock levellers near Hawick
The same survey, quote and repair service is available in towns around Hawick, such as Galashiels (13 miles) and Peebles (22 miles).
Other loading bay services in Hawick
Full guide to edge-of-dock levellers · Everything we do in Hawick
Ready to talk about a loading bay in Hawick? Call us, or send the details through the quote form.
