- Location
- Pitlochry, Perth and Kinross
- Main postcode district
- PH9
- Nearby (straight line)
- Blairgowrie (17 miles), Crieff (23 miles) and Perth (24 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in Pitlochry choose this?
Companies running their own vehicles in Pitlochry, where every trailer has a known bed height, are well placed to use edge-of-dock levellers instead of pit units. Smaller distribution units in Pitlochry without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face.
Replacing loose bridge plates at a dock in Pitlochry with a fixed edge-of-dock leveller removes the need to lift and position heavy plates by hand.
We keep the process simple for sites in Pitlochry. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Yard gradient and the slope of the approach to the dock
- Wheel guide positions and yard markings for reversing vehicles
- Asbestos register and any other site hazard information
- How drivers are prevented from pulling away too early
- Escape routes and pedestrian doors close to the bay
- Forklift and pallet truck loads crossing the leveller platform
Options to discuss
Mechanical edge-of-dock leveller
Lever-operated with spring assistance and no power supply needed. Suits low-volume bays and sites with consistent trailers where simplicity matters most.
Hydraulic edge-of-dock leveller
Push-button operation with a compact power pack, easier for frequent use and able to be interlocked with dock doors and traffic lights.
What do the rules in Scotland mean for the work?
Lift tables at Scottish sites are lifting equipment under LOLER, which means thorough examination at least every 12 months, or every 6 months if people are lifted, depending on the equipment and its use. For a site in Pitlochry, your insurer or competent person will confirm the interval, and we check what applies at survey.
Questions about edge-of-dock levellers in Pitlochry
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in Pitlochry, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Will you deal with building control and planning for a project in Pitlochry?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Pitlochry site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Can an edge-of-dock leveller be fitted to any dock?
Most docks can take one if the dock face or edge steel is sound enough to fix to. Damaged concrete or worn edge angles may need repair first. The more important question is whether your trailer heights fall within the leveller's small working range, which we check at survey.
How long does an edge-of-dock leveller take to install?
Usually half a day to a day per bay, as there is no pit to form. Concrete or edge steel repairs add time, and hydraulic units also need connecting to power. We plan the work so the rest of the dock keeps operating while each bay is fitted.
Edge-of-dock levellers near Pitlochry
We also cover towns near Pitlochry, including Blairgowrie (17 miles), Crieff (23 miles) and Perth (24 miles). Each has its own page with the same services and process.
Other loading bay services in Pitlochry
Full guide to edge-of-dock levellers · Everything we do in Pitlochry
Send a few photos of the dock and a short description of the problem, and we will come back to you about your Pitlochry site.
