An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
How does this suit sites in Kent?
Smaller distribution units in Kent without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face. Tenants of leased warehouses in Kent who cannot cut into the slab may find an edge-of-dock leveller the most workable way to improve loading.
On older buildings in Kent where drains or services run close to the dock, avoiding a pit can make an edge-of-dock leveller the sensible route.
Any project involving edge-of-dock levellers at a working site in Kent takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
Where does an edge-of-dock leveller work best?
An edge-of-dock leveller works best where trailer heights are consistent, a pit is impractical, or the budget rules out a pit leveller. It is a practical choice for many smaller operations and for adding capacity at larger ones.
- Leased units: where the lease or landlord does not allow a pit to be cut into the slab.
- Dedicated fleets: sites loading their own vehicles of a known bed height.
- Extra bays: adding loading positions at a dock where most bays already have pit levellers.
- Difficult slabs: where drainage, services or the structure would make a pit costly.
- Low-volume docks: occasional deliveries that do not justify a pit leveller.
Our guide on how to choose a dock leveller compares edge-of-dock, swing-lip and telescopic units in more detail, including the trailer and equipment questions to answer before deciding.
Towns we cover in Kent
Find your town in the list below for details of edge-of-dock levellers across Kent, or contact us if your location is not shown.
- Maidstone
- Gillingham
- Chatham
- Royal Tunbridge Wells
- Folkestone
- Margate
- Ashford
- Canterbury
- Sittingbourne
- Gravesend
- Dartford
- Ramsgate
- Dover
- Tonbridge
- Strood
- Whitstable
- Deal
- Sevenoaks
- Rochester
- Herne Bay
- Broadstairs
- Faversham
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
Regulations and approvals in England
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Kent. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions
Is VAT included in your guide prices for edge-of-dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Kent as everywhere else: for edge-of-dock levellers, it is £1,800 to £4,400 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Kent, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Does the dock door still close with the leveller fitted?
Yes, in most layouts. Edge-of-dock levellers sit at the outer edge of the dock and store with the lip raised or folded, so the door closes behind them as normal. We check the clearance between the door, its bottom seal and the stored leveller at survey.
Can an edge-of-dock leveller be fitted to any dock?
Most docks can take one if the dock face or edge steel is sound enough to fix to. Damaged concrete or worn edge angles may need repair first. The more important question is whether your trailer heights fall within the leveller's small working range, which we check at survey.
Other services in Kent
Full guide to edge-of-dock levellers · All loading bay services in Kent

