- Location
- New Milton, Hampshire
- Main postcode district
- BH25
- Nearby (straight line)
- Christchurch (5 miles), Bournemouth (10 miles) and Ferndown (11 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in New Milton choose this?
Smaller distribution units in New Milton without dock pits can add a practical loading position with an edge-of-dock leveller fixed straight to the dock face. If trailer heights at a site in New Milton vary widely, our survey will tell you plainly whether an edge-of-dock leveller can cope or a pit leveller is needed.
Replacing loose bridge plates at a dock in New Milton with a fixed edge-of-dock leveller removes the need to lift and position heavy plates by hand.
For edge-of-dock levellers in New Milton, we begin with a free site survey and a fixed written quote, so you know the scope and cost before committing. We take responsibility for managing the job, and specialist installation engineers carry it out under our supervision. Bays are taken out of use in a planned sequence so the rest of the dock keeps working, and evening or weekend work can be arranged. Each item is tested at handover and the documentation is left with you.
How much does an edge-of-dock leveller cost?
An edge-of-dock leveller typically costs £1,800 to £4,400 per leveller, excluding VAT, supply and fit. That is considerably less than a pit leveller, because there is no pit to form or maintain and the unit itself is smaller.
The price depends on:
- Operation: mechanical units with a lever and spring assistance cost less than hydraulic push-button units.
- Width and capacity: wider plates and higher ratings for heavier forklifts.
- Fixing method: bolting to sound concrete, welding to an existing steel edge, or fitting a new edge angle first.
- Dock face condition: spalled or damaged concrete may need repair before fixing.
- Bumpers: often replaced or repositioned at the same time.
- Power: hydraulic units need a supply at the bay.
Concrete repairs or new edge steel are priced as separate items after survey, so you can see exactly what the leveller costs on its own. The written quote is the fixed price.
Should I choose a mechanical or hydraulic edge-of-dock leveller?
Choose a mechanical edge-of-dock leveller for occasional use and simple sites, and a hydraulic one where the bay is busy or operators need push-button control. Both bridge a similar small height range.
- Mechanical: the operator pulls a lever or handle and the lip lifts and drops onto the bed with spring assistance. No power is needed and there is little to go wrong, but it takes some physical effort.
- Hydraulic: a push button raises the plate and extends the lip, then lowers it onto the trailer. It is easier and quicker for frequent use and can be interlocked with the dock door and traffic lights.
Other choices include plate width, which should suit the wheel track of your pallet trucks and forklifts, and capacity, which must cover the truck and its heaviest load. On exposed external docks, a galvanised or well-painted finish helps the unit cope with rain, frost and road salt.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Escape routes and pedestrian doors close to the bay
- Wall and steel structure for door, shelter and bumper fixings
- Traffic routes for vehicles and separation of pedestrians
- Whether planning, building control or a building warrant may be needed
- Age and condition of the equipment already in place
- Condition of any existing leveller pit, kerb angles and pit drainage
Options to discuss
Mechanical edge-of-dock leveller
Lever-operated with spring assistance and no power supply needed. Suits low-volume bays and sites with consistent trailers where simplicity matters most.
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
Which rules apply in England?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in New Milton. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about edge-of-dock levellers in New Milton
Will you deal with building control and planning for a project in New Milton?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in New Milton, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Which building and safety rules apply to a site in New Milton?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in New Milton, we check what applies at survey and design to it.
Does the dock door still close with the leveller fitted?
Yes, in most layouts. Edge-of-dock levellers sit at the outer edge of the dock and store with the lip raised or folded, so the door closes behind them as normal. We check the clearance between the door, its bottom seal and the stored leveller at survey.
Can edge-of-dock levellers be used with vans?
Usually not. Edge-of-dock levellers are designed for trailers whose beds sit close to dock height, and many vans sit well below a typical dock, beyond the leveller's range. A lift table or a ground-level door is normally the better way to handle vans.
Edge-of-dock levellers near New Milton
The same survey, quote and repair service is available in towns around New Milton, such as Christchurch (5 miles), Bournemouth (10 miles) and Ferndown (11 miles).
Other loading bay services in New Milton
Full guide to edge-of-dock levellers · Everything we do in New Milton
Have photos of the door, leveller or shelter? Send them with your enquiry and we can give a clearer answer for your New Milton site.
