- Location
- Fareham, Hampshire
- Main postcode district
- PO16
- Nearby (straight line)
- Gosport (4 miles), Portsmouth (5 miles) and Hedge End (7 miles)
- Survey and quote
- Free, with a fixed written quote
An edge-of-dock leveller is a compact leveller mounted on the front face or top edge of a loading dock, with no pit needed. A short hinged plate and lip bridge the gap between dock and trailer, but it can only cover a small height difference above and below dock level, so it suits sites where trailer bed heights are consistent.
Why do sites in Fareham choose this?
Replacing loose bridge plates at a dock in Fareham with a fixed edge-of-dock leveller removes the need to lift and position heavy plates by hand. If trailer heights at a site in Fareham vary widely, our survey will tell you plainly whether an edge-of-dock leveller can cope or a pit leveller is needed.
Tenants of leased warehouses in Fareham who cannot cut into the slab may find an edge-of-dock leveller the most workable way to improve loading.
We keep the process simple for sites in Fareham. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
How is an edge-of-dock leveller fitted to an existing dock?
An edge-of-dock leveller is fixed to the front face or top edge of the dock from the yard side, and installation usually takes around half a day to a day per bay. No digging is involved.
- The dock face is inspected, and damaged concrete or worn edge steel is repaired or replaced first if needed.
- The leveller is positioned centrally on the door opening and bolted or welded in place.
- Bumpers are fitted or repositioned so trailers stop at the right distance from the plate.
- On hydraulic units, the power pack and controls are connected.
- The leveller is tested across its working range.
You will need to keep the yard approach to the bay clear, take the bay out of use and, for hydraulic units, provide a power supply near the door or ask us to include one. Because the work is outside, very wet or freezing weather can affect welding and fixing, so we keep the date flexible where we can.
Do edge-of-dock levellers need the same inspections as pit levellers?
Yes, an edge-of-dock leveller is work equipment just like a pit leveller, so it must be kept in a safe condition and inspected where deterioration could lead to danger. Its small size does not exempt it.
- Great Britain: PUWER 1998 applies, with HSE as the regulator.
- Northern Ireland: PUWER (Northern Ireland) 1999 applies, with HSENI as the regulator.
- Insurer inspections: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals, so ask your insurer to confirm edge-of-dock units are on the schedule.
- Standard: the dock leveller safety standard is BS EN 1398:2009, which is current and under review.
- Trapping points: HSE guidance notes that guards or skirting may be needed on dock levellers where something could be caught, so hinge areas and plate edges are checked.
Mechanical units rely on springs and hinges that wear, so an inspection should cover these as carefully as the hydraulics on a powered unit.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What do we check at the survey?
- Working hours, shift patterns and windows for out-of-hours work
- Wind exposure at the dock, which affects door and shelter choice
- Headroom above the opening and which track type will suit it
- Wall and steel structure for door, shelter and bumper fixings
- How drivers are prevented from pulling away too early
- Access for deliveries, cranes or lifting equipment during installation
Options to discuss
Wider or heavy-duty plate
A wider plate or higher rating for larger forklifts, heavy loads or pallet trucks with a wide wheel track, specified after we look at your equipment.
New edge steel and bumpers
A replacement steel edge angle and correctly positioned bumpers to give a sound fixing and protect the leveller from trailer impact.
What do the rules in England mean for the work?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Fareham. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about edge-of-dock levellers in Fareham
How long does installation take at a site in Fareham?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Can you work alongside our main contractor on a new build in Fareham?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
What details do you need from us to quote for edge-of-dock levellers?
To get started, send the site address in Fareham, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Is an edge-of-dock leveller better than a loose dock plate?
For regular use, usually yes. A fixed edge-of-dock leveller cannot slide out of position or be dropped, and it does not need carrying between bays. Loose plates still have a place for occasional use, but they bring handling and slipping risks that a fixed unit avoids.
Does the dock door still close with the leveller fitted?
Yes, in most layouts. Edge-of-dock levellers sit at the outer edge of the dock and store with the lip raised or folded, so the door closes behind them as normal. We check the clearance between the door, its bottom seal and the stored leveller at survey.
Edge-of-dock levellers near Fareham
Looking beyond Fareham? Our pages for Gosport (4 miles), Portsmouth (5 miles) and Hedge End (7 miles) describe the same loading bay services and how to get in touch.
Other loading bay services in Fareham
Full guide to edge-of-dock levellers · Everything we do in Fareham
Phone us to discuss your loading bay in Fareham, or start with the online quote tool if you prefer to send details first.
