Guide £650–£3,400 per bay ex VATFree site surveyEngland
Dock control panel and red and green traffic light beside a closed sectional door
In short

Dock traffic lights are red and green signals mounted outside and inside a loading bay to tell the driver and dock staff when it is safe to move or load. Interlocks are control links that stop equipment operating out of sequence, for example preventing the door opening until the trailer is restrained, or the leveller operating until the door is fully open.

Where does this fit at a dock in Herefordshire?

If a site in Herefordshire has had door panels damaged by levellers raised too early, a leveller-to-door interlock is a straightforward fix to consider. New warehouses in Herefordshire can have lights and interlocks wired in during the electrical fit-out, avoiding retrofit cabling and keeping every bay on one control standard.

Loading docks in Herefordshire where drivers wait in their cabs for a hand signal can replace guesswork with a clear red and green light at every bay.

Any project involving dock traffic lights and interlocks at a working site in Herefordshire takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.

How much do dock traffic lights and interlocks cost?

Dock traffic lights and interlocks typically cost £650 to £3,400 per bay, supplied and fitted, excluding VAT. A pair of manually switched LED signals sits at the lower end, while a full interlock panel linking door, leveller, restraint and shelter sits towards the top.

What moves the price:

  • Level of control: standalone lights, door-linked lights or a full interlocked sequence.
  • Existing control panels: modern door and leveller panels often accept interlocks directly; older panels may need replacing with a combined bay panel.
  • Sensors: door position switches, trailer presence sensors and restraint signals each add parts and wiring.
  • Cable runs: distances between lights, panels and the power supply.
  • Number of bays and timing: repeat bays reduce the cost per bay, while out-of-hours working adds to it.

These are guide budgets. After a free site survey we send a written quote, and that quote is the fixed price. VAT is added at the standard rate.

Which interlocks should a loading bay have?

The most useful loading bay interlocks stop the door opening until the trailer is in place or restrained, and stop the leveller operating until the door is fully open. Beyond that, the right set depends on the equipment fitted and your risk assessment.

  • Door to restraint: the door cannot open until the restraint is engaged or a trailer is detected.
  • Leveller to door: the leveller cannot be raised until the door is fully open, which prevents the lip hitting door panels.
  • Door to leveller: the door cannot close until the leveller is back in its parked position.
  • Restraint release: the restraint only releases once the door is closed and the leveller parked.
  • Shelter to trailer: an inflatable shelter only inflates when a trailer is docked.

On a bay without a restraint, a trailer presence sensor can take its place in the door logic, although it confirms a trailer is there rather than holding it. Combining interlocks with vehicle restraints gives the strongest protection against drive-away.

Towns we cover in Herefordshire

We provide dock traffic lights and interlocks right across Herefordshire. Pick the town closest to your site from the list below.

Guide price
£650–£3,400 per bay, ex VAT

Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.

What do the rules in England mean for the work?

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Herefordshire. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions

Can you work alongside our main contractor on a new build in Herefordshire?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Do you cover Herefordshire for dock traffic lights and interlocks?

Yes. We take on dock traffic lights and interlocks for businesses in Herefordshire and across Herefordshire. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.

Do traffic lights and interlocks need maintenance?

Yes. Lights, sensors and interlocks should be checked at each planned service visit, including testing the full sequence and confirming that steps attempted out of order are blocked. As part of the dock equipment they fall under PUWER, which requires work equipment to be maintained in a safe condition.

Can you add lights and interlocks across a whole dock in one project?

Yes. A whole-dock project is usually phased bay by bay so most doors stay in use, and every bay ends up on the same control standard. That consistency makes training easier for staff and drivers, and it simplifies servicing because every bay behaves in the same way.