A complete loading bay installation is the supply and fitting of every item a dock needs as one coordinated package: typically an insulated door, a dock leveller, a shelter or seal, bumpers, wheel guides, a dock light and traffic lights or interlocks. One party manages the design, sequence and commissioning, so the parts fit together and work as a single system.
How does this suit sites in Wiltshire?
Main contractors working on warehouse schemes around Wiltshire need pit drawings and embed details early, which a complete bay package provides at design stage. Occupiers taking on a shell unit in Wiltshire often need every bay fitted out at once, and a single programme keeps the handover date predictable.
Every complete bay enquiry in Wiltshire starts with a site survey and a written quote that sets out exactly what is included and what is priced separately.
We never ask you to commit before you have a fixed price. A free survey at your Wiltshire site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.
How do you choose the right equipment for each bay?
The right equipment for each bay comes from three questions: what vehicles arrive, what goods move through the door, and how many trailers the bay handles each day. The answers drive each choice:
- Vehicles: trailer bed heights commonly range from about 900 to 1,600 mm, which sets leveller length. Trailers that cannot reverse tight to the dock, or need end-loading, suit a telescopic lip.
- Goods: chilled and frozen goods need a well-insulated door and a tight seal or inflatable shelter; ambient goods usually suit a retractable shelter.
- Traffic: very busy bays may justify faster doors and heavier-duty levellers, plus restraints and interlocks.
- Building: a pit leveller, an edge-of-dock leveller or a loading house, depending on floor height and space.
Not every bay on a site needs the same kit. One bay with a lift table or a telescopic lip can handle the awkward vehicles. Our guide to specifying the dock package for a new warehouse walks through the decisions.
How is a complete bay coordinated with civils and electrics?
A complete bay is coordinated by issuing pit, dock face and electrical details early, so the groundworker, main contractor and electrician build exactly what the equipment needs. Most problems on new docks come from mismatches between trades, not from the equipment itself.
- Drawings: we provide pit dimensions, steel edge details, drainage points and dock face levels for each bay.
- Civils: the groundworker forms the pits, approach and dock face to those drawings, or the leveller is set in place for concrete to be poured around it.
- Building envelope: the main contractor forms the openings and cladding to suit the door and shelter sizes.
- Electrics: the electrician brings a supply to the agreed control panel position at each bay.
- Equipment: leveller, door, shelter and safety items are fitted in sequence, then commissioned together.
The quote states clearly which items are ours and which belong to other trades. See our guide to loading bay design for dock heights, widths and approaches.
Towns we cover in Wiltshire
Below is a list of towns in Wiltshire for complete loading bay installations. Each page explains our approach for sites in that town.
Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.
What do the rules in England mean for the work?
Workplace safety in England is regulated by HSE. For a loading bay in Wiltshire, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Wiltshire, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Can you work outside our normal operating hours in Wiltshire?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Who forms the leveller pit?
The leveller pit is usually formed by the groundworker or main contractor to our drawings. Where there is no groundworker on site, we can arrange the pit works as part of the project, priced separately after survey. Either way, the pit details come from the leveller chosen for the bay.
Can you replace a whole bay in an operating warehouse?
Yes. In a live building we replace one bay at a time, keeping the opening secure and the neighbouring bays working. The order and timing of each bay are agreed with you so the dock keeps enough capacity throughout the works.
Other services in Wiltshire
Full guide to complete loading bay installations · All loading bay services in Wiltshire

