- Location
- Woking, Surrey
- Main postcode district
- GU22
- Nearby (straight line)
- Weybridge (6 miles), Guildford (6 miles) and Egham (8 miles)
- Survey and quote
- Free, with a fixed written quote
A complete loading bay installation is the supply and fitting of every item a dock needs as one coordinated package: typically an insulated door, a dock leveller, a shelter or seal, bumpers, wheel guides, a dock light and traffic lights or interlocks. One party manages the design, sequence and commissioning, so the parts fit together and work as a single system.
What matters for complete loading bay installations in Woking?
Cold chain operators near Woking benefit from specifying the insulated door, shelter and leveller as one package so the thermal details match at every bay. Every complete bay enquiry in Woking starts with a site survey and a written quote that sets out exactly what is included and what is priced separately.
Developers building new distribution sheds in Woking can hand the whole dock package to one specialist, reducing the risk of gaps between the door, leveller and shelter trades.
We keep the process simple for sites in Woking. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
How much does a complete loading bay cost?
A complete loading bay typically costs £13,500 to £26,000 per bay, supplied and installed, excluding VAT. That covers the door, leveller, shelter or seal and core safety items, and assumes a sound structural opening and an existing or separately formed leveller pit.
What moves the price:
- Door type: an insulated sectional door costs less than a high-speed or cold store door.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Shelter or seal: inflatable shelters sit at the top of the range.
- Safety package: restraints, traffic lights and interlocks add to the base bay.
- Number of bays: repeat bays on one project lower the cost per bay.
- Programme: phased or out-of-hours working in a live building adds cost.
New pits, pit repairs, concrete and groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.
What regulations and standards apply to a new loading bay?
A new loading bay has to meet door safety law, work equipment law and, for the door, energy rules. The main references are:
- Doors: regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992 (Northern Ireland: the 1993 equivalent). Upward-opening doors need a device to stop them falling back, and powered doors need features to prevent trapping. Doors are made to BS EN 13241, with powered door safety covered by BS EN 12453.
- Levellers: BS EN 1398:2009, the dock leveller safety standard.
- All dock equipment: PUWER 1998, or PUWER (Northern Ireland) 1999, requiring suitable, maintained and inspected work equipment.
- Drive-away: HSE guidance (HSG136) says there should be safeguards against early drive-away, such as traffic lights, restraints or key control.
- Energy: in England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access doors. Other nations have their own rules, and we confirm the figure for your project.
Equipment in Great Britain may carry UKCA or CE marking; in Northern Ireland, CE or CE with UKNI.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Age and condition of the equipment already in place
- Lighting inside trailers and at the dock face
- Wall and steel structure for door, shelter and bumper fixings
- Working hours, shift patterns and windows for out-of-hours work
- Yard gradient and the slope of the approach to the dock
- Forklift and pallet truck loads crossing the leveller platform
Options to discuss
Safety pack add-on
Vehicle restraint, inside and outside traffic lights and interlocks between door, leveller and restraint, added to any bay specification as part of the same package.
Chilled or frozen bay
A well-insulated door, inflatable shelter or foam seal and a leveller suited to low temperatures, specified to keep cold air in and warm, moist air out.
Regulations and approvals in England
In England, Approved Document L (2021) sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. That shapes door specification for sites in Woking, so we confirm the requirement for your project and check what applies at survey before recommending a door.
Questions about complete loading bay installations in Woking
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Woking, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Is the site survey in Woking free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Woking site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
Do you work with main contractors on new builds?
Yes. On new warehouses we work as the specialist dock package contractor to the main contractor's programme. We provide pit, dock face and electrical details early so the groundworks and building envelope are built to suit the equipment, then install and commission each bay.
What paperwork do we receive at handover?
At handover you receive commissioning and test records, operating instructions and the maintenance requirements for each item. Equipment comes with the manufacturer's warranty, and our workmanship terms are those set out in writing in the quote. These records also help with insurer inspections later.
Complete loading bay installation near Woking
Looking beyond Woking? Our pages for Weybridge (6 miles), Guildford (6 miles) and Egham (8 miles) describe the same loading bay services and how to get in touch.
Other loading bay services in Woking
Full guide to complete loading bay installations · Everything we do in Woking
Send a few photos of the dock and a short description of the problem, and we will come back to you about your Woking site.
