- Location
- Horsforth, West Yorkshire
- Main postcode district
- LS18
- Nearby (straight line)
- Yeadon (3 miles), Pudsey (3 miles) and Guiseley (4 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
Is this right for your site in Horsforth?
Mixed bays at a site in Horsforth, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers. Fitting out a new warehouse in Horsforth with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Should a recent insurance inspection at a site in Horsforth have flagged leveller defects, a survey can show whether repair or replacement makes more sense.
Your loading bay stays our responsibility from the survey to the handover. In Horsforth, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Condition of any existing leveller pit, kerb angles and pit drainage
- Gaps around trailers where heated or chilled air escapes
- Access for deliveries, cranes or lifting equipment during installation
- Drainage on recessed or sloping dock approaches
- Yard gradient and the slope of the approach to the dock
- How drivers are prevented from pulling away too early
Options to discuss
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Standard swing-lip leveller
A hydraulic pit leveller with a hinged lip of about 400 to 500 mm, suited to general distribution with curtain-siders and box trailers.
Regulations and approvals in England
Sites in Horsforth fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about swing-lip dock levellers in Horsforth
Is VAT included in your guide prices for swing-lip dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in West Yorkshire as everywhere else: for swing-lip dock levellers, it is £5,200 to £8,800 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Can you work outside our normal operating hours in Horsforth?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Is the site survey in Horsforth free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
How long does a replacement leveller take to arrive?
Lead times depend on size, specification and the manufacturer, and we confirm them in the written quote. The existing leveller can usually stay in use until the replacement is on site, so the bay is only closed for the installation itself.
What happens if a trailer pulls away with the lip on its bed?
The platform drops until its safety system stops it. Hydraulic levellers have a velocity fuse that arrests the fall, but the event can still damage the leveller and endanger anyone on it, which is why dock traffic lights, restraints and key control are used to prevent early drive-away.
Swing-lip dock levellers near Horsforth
The same survey, quote and repair service is available in towns around Horsforth, such as Yeadon (3 miles), Pudsey (3 miles) and Guiseley (4 miles).
Other loading bay services in Horsforth
Full guide to swing-lip dock levellers · Everything we do in Horsforth
Whether it is a new bay or a fault on an existing one, call us or request a quote for your site in Horsforth.
