Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock levellers · Ashington

Swing-lip dock levellers in Ashington

This page explains how we handle swing-lip dock levellers for sites in Ashington: what we look at, how the work is organised and what to send us to get things moving.

Guide £5,200–£8,800 per leveller ex VATFree site surveyNE63
Location
Ashington, Northumberland
Main postcode district
NE63
Nearby (straight line)
Bedlington (3 miles), Blyth (4 miles) and Cramlington (6 miles)
Survey and quote
Free, with a fixed written quote
Swing-lip dock levellers, in short

A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.

Is this right for your site in Ashington?

Mixed bays at a site in Ashington, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers. Every leveller recommendation we make for a dock in Ashington follows a measured survey of the pit, dock height and the trailers you actually receive.

Distribution warehouses in Ashington loading curtain-siders and box trailers every day are typical users of swing-lip levellers, which handle routine pallet loading well.

Any project involving swing-lip dock levellers at a working site in Ashington takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.

Do dock levellers have to be inspected by law?

Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.

  • Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
  • Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
  • Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
  • LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
  • Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.

Our inspection guide explains what an examiner looks at.

What happens when a swing-lip leveller is fitted into an existing pit?

Fitting a swing-lip leveller into an existing pit normally takes one to two working days per bay, with the bay closed throughout. The work runs in a set order:

  1. The old leveller is isolated, lifted out and removed from site.
  2. The pit is cleaned and measured, and the edge steel checked for damage.
  3. The new leveller is lowered in, set level, and welded or anchored to the pit steel.
  4. The hydraulic power pack and control panel are connected, and any interlocks wired.
  5. Toe guards, lip and bumpers are checked, then the leveller is run through its full range.

From your side we need the bay emptied and taken out of service, clear access for lifting equipment inside or outside the building, and a suitable power supply, which for most hydraulic levellers is three-phase. If the pit needs repairs, these are done first and can add time, which we confirm in the quote.

Guide price, Ashington
£5,200–£8,800 per leveller, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Age and condition of the equipment already in place
  • Working hours, shift patterns and windows for out-of-hours work
  • Access for deliveries, cranes or lifting equipment during installation
  • Yard gradient and the slope of the approach to the dock
  • How drivers are prevented from pulling away too early
  • Forklift and pallet truck loads crossing the leveller platform

Options to discuss

Standard swing-lip leveller

A hydraulic pit leveller with a hinged lip of about 400 to 500 mm, suited to general distribution with curtain-siders and box trailers.

Long-platform leveller

A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.

Regulations and approvals in England

Lift tables and dock lifts in Ashington may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about swing-lip dock levellers in Ashington

Will you deal with building control and planning for a project in Ashington?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Can you work alongside our main contractor on a new build in Ashington?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Ashington, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

Can a new leveller fit our old pit?

Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.

What capacity of leveller do we need?

The leveller needs to be rated for the heaviest combined load of forklift and goods that will cross it, allowing for the truck moving over it. General-purpose levellers are typically rated around 60 kN, with heavier ratings for heavy goods or large forklifts. We confirm the rating after looking at your equipment.

Swing-lip dock levellers near Ashington

Close neighbours of Ashington with their own pages here: Bedlington (3 miles), Blyth (4 miles) and Cramlington (6 miles). Choose one to see coverage details for that town.

Other loading bay services in Ashington

Full guide to swing-lip dock levellers · Everything we do in Ashington

Call us or request a quote online to talk through loading bay work at your site in Ashington.

Call freeGet a quote