- Location
- Deal, Kent
- Main postcode district
- CT14
- Nearby (straight line)
- Dover (8 miles), Ramsgate (8 miles) and Broadstairs (9 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What should sites in Deal consider?
Ageing levellers in older docks around Deal can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound. Should a recent insurance inspection at a site in Deal have flagged leveller defects, a survey can show whether repair or replacement makes more sense.
Fitting out a new warehouse in Deal with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Keeping the dock running is usually the first concern, so we plan around it. After a free survey of your Deal site and a written quote at a fixed price, we agree when each bay can be released and whether any work should happen out of hours. Specialist installation engineers working under our management then fit the equipment, and we test it and hand over the documentation before the bay goes back into use.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Scope to convert ground-level doors into docks or add lift tables
- Access for deliveries, cranes or lifting equipment during installation
- Traffic routes for vehicles and separation of pedestrians
- Bumper position and wear or damage on the dock face
- Whether planning, building control or a building warrant may be needed
- Temperature requirements for chilled, frozen or ambient goods
Options to discuss
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
What do the rules in England mean for the work?
Lift tables and dock lifts in Deal may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about swing-lip dock levellers in Deal
What details do you need from us to quote for swing-lip dock levellers?
To get started, send the site address in Deal, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Is VAT included in your guide prices for swing-lip dock levellers?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Kent as everywhere else: for swing-lip dock levellers, it is £5,200 to £8,800 per leveller, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Will you deal with building control and planning for a project in Deal?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can a swing-lip leveller be used as a ramp to the yard?
No, a leveller should only be used to bridge a docked trailer. The lip and toe guards are designed to work with a trailer bed in place, and the platform is not built as a ramp down to yard level. Where you need ground-level access, a separate door or a lift table is the safer answer.
Do levellers need a three-phase supply?
Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.
Swing-lip dock levellers near Deal
Other towns within reach of Deal on our coverage list include Dover (8 miles), Ramsgate (8 miles) and Broadstairs (9 miles), all covered on the same terms.
Other loading bay services in Deal
Full guide to swing-lip dock levellers · Everything we do in Deal
Get in touch about loading bay doors and dock equipment in Deal: call, email or use the quote tool.
