- Location
- Altrincham, Greater Manchester
- Main postcode district
- WA14
- Nearby (straight line)
- Sale (3 miles), Urmston (4 miles) and Stretford (5 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
Where does this fit at a dock in Altrincham?
Mixed bays at a site in Altrincham, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers. Fitting out a new warehouse in Altrincham with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Operators in Altrincham who have added electric pallet trucks to their fleet may find an existing leveller too short, making a longer platform worth considering.
We do not give a fixed price without seeing the site. A free survey in Altrincham lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.
What happens when a swing-lip leveller is fitted into an existing pit?
Fitting a swing-lip leveller into an existing pit normally takes one to two working days per bay, with the bay closed throughout. The work runs in a set order:
- The old leveller is isolated, lifted out and removed from site.
- The pit is cleaned and measured, and the edge steel checked for damage.
- The new leveller is lowered in, set level, and welded or anchored to the pit steel.
- The hydraulic power pack and control panel are connected, and any interlocks wired.
- Toe guards, lip and bumpers are checked, then the leveller is run through its full range.
From your side we need the bay emptied and taken out of service, clear access for lifting equipment inside or outside the building, and a suitable power supply, which for most hydraulic levellers is three-phase. If the pit needs repairs, these are done first and can add time, which we confirm in the quote.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Whether planning, building control or a building warrant may be needed
- Wheel guide positions and yard markings for reversing vehicles
- Scope to convert ground-level doors into docks or add lift tables
- Wall and steel structure for door, shelter and bumper fixings
- Age and condition of the equipment already in place
- Forklift and pallet truck loads crossing the leveller platform
Options to discuss
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Regulations and approvals in England
Lift tables and dock lifts in Altrincham may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about swing-lip dock levellers in Altrincham
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Altrincham, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Do you cover Altrincham for swing-lip dock levellers?
Yes. We take on swing-lip dock levellers for businesses in Altrincham and across Greater Manchester. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
How do you price swing-lip dock levellers for a site in Altrincham?
Guide budgets for supply and fit are £5,200 to £8,800 per leveller, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
What happens if a trailer pulls away with the lip on its bed?
The platform drops until its safety system stops it. Hydraulic levellers have a velocity fuse that arrests the fall, but the event can still damage the leveller and endanger anyone on it, which is why dock traffic lights, restraints and key control are used to prevent early drive-away.
Can a new leveller fit our old pit?
Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.
Swing-lip dock levellers near Altrincham
Nearby places we cover, measured from Altrincham, include Sale (3 miles), Urmston (4 miles) and Stretford (5 miles). Ask if your own town is missing.
Other loading bay services in Altrincham
Full guide to swing-lip dock levellers · Everything we do in Altrincham
Use the quote tool to tell us about the doors, levellers or shelters at your Altrincham site, and we will be in touch to arrange the next step.
