Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Dock levellers · East Riding of Yorkshire

Swing-lip dock levellers in the East Riding of Yorkshire

For swing-lip dock levellers in the East Riding of Yorkshire, you deal with one specialist who looks at the site, agrees the scope and manages the engineers who carry out the work. Towns covered include Kingston upon Hull, Bridlington, Beverley and Goole.

Guide £5,200–£8,800 per leveller ex VATFree site surveyEngland
Hydraulic swing-lip dock leveller sloping into the back of a curtain-sider trailer
In short

A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.

How does this suit sites in the East Riding of Yorkshire?

Mixed bays at a site in the East Riding of Yorkshire, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers. Chilled food distributors in the East Riding of Yorkshire can specify insulated swing-lip levellers with pit seals to cut cold loss through the floor of the bay.

Should a recent insurance inspection at a site in the East Riding of Yorkshire have flagged leveller defects, a survey can show whether repair or replacement makes more sense.

Your loading bay stays our responsibility from the survey to the handover. In the East Riding of Yorkshire, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.

What happens when a swing-lip leveller is fitted into an existing pit?

Fitting a swing-lip leveller into an existing pit normally takes one to two working days per bay, with the bay closed throughout. The work runs in a set order:

  1. The old leveller is isolated, lifted out and removed from site.
  2. The pit is cleaned and measured, and the edge steel checked for damage.
  3. The new leveller is lowered in, set level, and welded or anchored to the pit steel.
  4. The hydraulic power pack and control panel are connected, and any interlocks wired.
  5. Toe guards, lip and bumpers are checked, then the leveller is run through its full range.

From your side we need the bay emptied and taken out of service, clear access for lifting equipment inside or outside the building, and a suitable power supply, which for most hydraulic levellers is three-phase. If the pit needs repairs, these are done first and can add time, which we confirm in the quote.

Do dock levellers have to be inspected by law?

Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.

  • Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
  • Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
  • Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
  • LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
  • Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.

Our inspection guide explains what an examiner looks at.

Towns we cover in the East Riding of Yorkshire

Find your town in the list below for details of swing-lip dock levellers across the East Riding of Yorkshire, or contact us if your location is not shown.

Guide price
£5,200–£8,800 per leveller, ex VAT

Budget range for supply and fit. The written quote after a free survey is the fixed price. All guide prices.

Which rules apply in England?

Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in the East Riding of Yorkshire. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.

Questions

Which building and safety rules apply to a site in the East Riding of Yorkshire?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in the East Riding of Yorkshire, we check what applies at survey and design to it.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in the East Riding of Yorkshire, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

What happens if a trailer pulls away with the lip on its bed?

The platform drops until its safety system stops it. Hydraulic levellers have a velocity fuse that arrests the fall, but the event can still damage the leveller and endanger anyone on it, which is why dock traffic lights, restraints and key control are used to prevent early drive-away.

How long does a replacement leveller take to arrive?

Lead times depend on size, specification and the manufacturer, and we confirm them in the written quote. The existing leveller can usually stay in use until the replacement is on site, so the bay is only closed for the installation itself.

Other services in the East Riding of Yorkshire

Full guide to swing-lip dock levellers · All loading bay services in the East Riding of Yorkshire

Call freeGet a quote