- Location
- Poole, Dorset
- Main postcode district
- BH15
- Nearby (straight line)
- Bournemouth (5 miles), Wimborne Minster (5 miles) and Ferndown (7 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What matters for swing-lip dock levellers in Poole?
Distribution warehouses in Poole loading curtain-siders and box trailers every day are typical users of swing-lip levellers, which handle routine pallet loading well. Fitting out a new warehouse in Poole with pre-formed pits makes swing-lip levellers a straightforward choice for most general loading from day one.
Ageing levellers in older docks around Poole can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound.
Our part of the job in Poole is to survey, quote and manage; the fitting itself is done by specialist installation engineers working under our management. The survey and the written quote are free. Once the fixed price is accepted, we agree dates that work around your deliveries and shifts, including out-of-hours working where needed. Every installation is tested before handover, and you receive the documentation for each item fitted.
What happens when a swing-lip leveller is fitted into an existing pit?
Fitting a swing-lip leveller into an existing pit normally takes one to two working days per bay, with the bay closed throughout. The work runs in a set order:
- The old leveller is isolated, lifted out and removed from site.
- The pit is cleaned and measured, and the edge steel checked for damage.
- The new leveller is lowered in, set level, and welded or anchored to the pit steel.
- The hydraulic power pack and control panel are connected, and any interlocks wired.
- Toe guards, lip and bumpers are checked, then the leveller is run through its full range.
From your side we need the bay emptied and taken out of service, clear access for lifting equipment inside or outside the building, and a suitable power supply, which for most hydraulic levellers is three-phase. If the pit needs repairs, these are done first and can add time, which we confirm in the quote.
How much does a swing-lip dock leveller cost?
A swing-lip dock leveller typically costs £5,200 to £8,800 per leveller, excluding VAT, supply and fit, assuming it goes into an existing, sound pit. New pits, pit repairs, concrete and groundworks are priced separately after survey.
Within that range, the price is driven by:
- Platform length: longer platforms give a gentler gradient but cost more.
- Width and capacity: wider decks and higher load ratings use heavier steel and cylinders.
- Lip length: a longer lip reaches further onto the trailer bed.
- Insulation and sealing: insulated platforms and pit seals for chilled buildings.
- Controls and interlocks: links to the door, restraint or traffic lights.
- Removal and access: taking out the old unit, lifting equipment for delivery and out-of-hours work.
If the pit edge steel is damaged or the pit is out of square, we tell you at survey and price the repair as a separate item, so the leveller price stays clear. The written quote is then the fixed price for the work described.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Scope to convert ground-level doors into docks or add lift tables
- Lighting inside trailers and at the dock face
- Wall and steel structure for door, shelter and bumper fixings
- Age and condition of the equipment already in place
- Wind exposure at the dock, which affects door and shelter choice
- Temperature requirements for chilled, frozen or ambient goods
Options to discuss
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Standard swing-lip leveller
A hydraulic pit leveller with a hinged lip of about 400 to 500 mm, suited to general distribution with curtain-siders and box trailers.
Which rules apply in England?
Lift tables and dock lifts in Poole may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about swing-lip dock levellers in Poole
Do you cover Poole for swing-lip dock levellers?
Yes. We take on swing-lip dock levellers for businesses in Poole and across Dorset. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
How do you price swing-lip dock levellers for a site in Poole?
Guide budgets for supply and fit are £5,200 to £8,800 per leveller, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
Is the site survey in Poole free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Do levellers need a three-phase supply?
Most hydraulic dock levellers use a three-phase supply, although some smaller units run on single phase. When replacing like for like, the existing supply can often be reused if it is in good order. We check the supply at survey and include any electrical work in the quote.
How long does a replacement leveller take to arrive?
Lead times depend on size, specification and the manufacturer, and we confirm them in the written quote. The existing leveller can usually stay in use until the replacement is on site, so the bay is only closed for the installation itself.
Swing-lip dock levellers near Poole
Nearby places we cover, measured from Poole, include Bournemouth (5 miles), Wimborne Minster (5 miles) and Ferndown (7 miles). Ask if your own town is missing.
Other loading bay services in Poole
Full guide to swing-lip dock levellers · Everything we do in Poole
Get in touch about loading bay doors and dock equipment in Poole: call, email or use the quote tool.
