- Location
- Dungannon, County Tyrone
- Main postcode district
- BT71
- Nearby (straight line)
- Cookstown (10 miles), Armagh (12 miles) and Portadown (14 miles)
- Survey and quote
- Free, with a fixed written quote
A swing-lip dock leveller is a hydraulic ramp set into a pit at the dock edge, with a hinged steel lip along its front. When a trailer is docked the platform rises, the lip swings out, and the platform lowers until the lip rests on the trailer bed, forming a bridge for forklifts and pallet trucks. The lip is typically about 400 to 500 mm long.
What should sites in Dungannon consider?
Chilled food distributors in Dungannon can specify insulated swing-lip levellers with pit seals to cut cold loss through the floor of the bay. Mixed bays at a site in Dungannon, where some trailers have tail lifts and others do not, may suit a combination of swing-lip and telescopic levellers.
Ageing levellers in older docks around Dungannon can often be replaced like for like in the existing pit, avoiding new concrete work if the pit is sound.
How does an installation in Dungannon work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.
Do dock levellers have to be inspected by law?
Yes, dock levellers are work equipment and must be kept in a safe condition and inspected where deterioration could lead to danger. The law and the regulator depend on where the site is.
- Great Britain: the Provision and Use of Work Equipment Regulations 1998 (PUWER), enforced by HSE.
- Northern Ireland: PUWER (Northern Ireland) 1999, enforced by HSENI.
- Inspection interval: engineering insurers commonly inspect dock levellers under PUWER at 12-month intervals.
- LOLER: most levellers are treated as work equipment under PUWER, but one designed or used to lift people may fall under LOLER, or LOLER (Northern Ireland) 1999, with 6-monthly thorough examination. It depends on the equipment and how it is used; your insurer or competent person will confirm.
- Standard: BS EN 1398:2009 sets the safety requirements for dock levellers. It is current and under review.
Our inspection guide explains what an examiner looks at.
How long should a dock leveller platform be?
A leveller platform should be long enough to keep the slope gentle across the full range of trailer heights you load, because the steepest gradient decides which handling equipment can use it safely. A longer platform spreads the same height difference over a greater distance.
- Know your trailer mix: with a dock typically around 1,200 mm high and trailer beds ranging from roughly 900 to 1,600 mm, the height difference can be considerable.
- Check your equipment: low-clearance electric pallet trucks cope with less gradient than a counterbalance forklift with good ground clearance.
- Common lengths: platforms are commonly made from around 2 to 3.5 m long, with longer units where trailers sit very low or very high.
- Width: a wider platform gives more room when pallets sit close to the trailer sides.
When replacing a unit, the pit size limits what can be fitted, so we measure the pit and record your trailer heights at survey before recommending a length.
The same published guide range applies across Northern Ireland; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Temperature requirements for chilled, frozen or ambient goods
- Drainage on recessed or sloping dock approaches
- Wall and steel structure for door, shelter and bumper fixings
- Wind exposure at the dock, which affects door and shelter choice
- Scope to convert ground-level doors into docks or add lift tables
- Age and condition of the equipment already in place
Options to discuss
Long-platform leveller
A longer platform that keeps gradients gentle where trailer heights vary widely or low-clearance electric pallet trucks are used across the bay.
Insulated leveller
An insulated platform with perimeter seals around the pit that reduces cold loss through the floor of the bay at chilled and frozen docks.
Planning, building control and safety law in Northern Ireland
The equipment regulations have separate Northern Ireland versions: PUWER (Northern Ireland) 1999 for work equipment such as dock levellers and doors, and LOLER (Northern Ireland) 1999 for lifting equipment such as scissor lift tables. For sites in Dungannon, your insurer or competent person will confirm inspection intervals, and we check what applies at survey.
Questions about swing-lip dock levellers in Dungannon
How long does installation take at a site in Dungannon?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Can you work alongside our main contractor on a new build in Dungannon?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Which building and safety rules apply to a site in Dungannon?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Dungannon, we check what applies at survey and design to it.
Can a new leveller fit our old pit?
Usually, yes. Levellers are made in standard sizes and many can be supplied to suit an existing pit, but the pit must be square, sound and deep enough. We measure the pit and check the edge steel at survey, and if adjustment or repair is needed we price it separately.
What capacity of leveller do we need?
The leveller needs to be rated for the heaviest combined load of forklift and goods that will cross it, allowing for the truck moving over it. General-purpose levellers are typically rated around 60 kN, with heavier ratings for heavy goods or large forklifts. We confirm the rating after looking at your equipment.
Swing-lip dock levellers near Dungannon
The same survey, quote and repair service is available in towns around Dungannon, such as Cookstown (10 miles), Armagh (12 miles) and Portadown (14 miles).
Other loading bay services in Dungannon
Full guide to swing-lip dock levellers · Everything we do in Dungannon
Get in touch about loading bay doors and dock equipment in Dungannon: call, email or use the quote tool.
