Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Stourport-on-Severn

Scissor lift tables in Stourport-on-Severn

If your site in Stourport-on-Severn needs scissor lift tables, we can help, whether the dock serves a cold store, a parcel operation, a food factory or a trade counter.

Guide £9,500–£28,000 per lift ex VATFree site surveyDY13
Location
Stourport-on-Severn, Worcestershire
Main postcode district
DY13
Nearby (straight line)
Kidderminster (4 miles), Droitwich (7 miles) and Bromsgrove (9 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

What should sites in Stourport-on-Severn consider?

Older industrial buildings in Stourport-on-Severn built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard. Each lift table enquiry from Stourport-on-Severn is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately.

Businesses in Stourport-on-Severn receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.

We do not give a fixed price without seeing the site. A free survey in Stourport-on-Severn lets us check the details that affect the job, and the written quote that follows is a fixed price for the agreed scope. We plan the work around your operation, arrange out-of-hours access if you need it and manage specialist installation engineers throughout. Handover includes testing, a demonstration and the paperwork you need for your records.

What inspections does a scissor lift table need under LOLER?

A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.

In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.

Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.

We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

Guide price, Stourport-on-Severn
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Lighting inside trailers and at the dock face
  • Gaps around trailers where heated or chilled air escapes
  • Access for deliveries, cranes or lifting equipment during installation
  • Bumper position and wear or damage on the dock face
  • Drainage on recessed or sloping dock approaches
  • Whether planning, building control or a building warrant may be needed

Options to discuss

Safety bellows and skirts

A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.

Bridge plate

A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.

What do the rules in England mean for the work?

Workplace safety in England is regulated by HSE. For a loading bay in Stourport-on-Severn, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.

Questions about scissor lift tables in Stourport-on-Severn

Can you work alongside our main contractor on a new build in Stourport-on-Severn?

Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.

Is the site survey in Stourport-on-Severn free?

Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.

Is VAT included in your guide prices for scissor lift tables?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Worcestershire as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

How often does a lift table need servicing?

A lift table needs routine maintenance as well as its LOLER thorough examinations. Many sites combine the two so the lift is serviced shortly before each examination. The right maintenance frequency depends on how heavily the lift is used, and we agree it with you at handover.

Does a scissor lift table need a pit?

No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.

Scissor lift tables near Stourport-on-Severn

Sites close to Stourport-on-Severn get the same service, including those in Kidderminster (4 miles), Droitwich (7 miles) and Bromsgrove (9 miles), with every job run the same way.

Other loading bay services in Stourport-on-Severn

Full guide to scissor lift tables · Everything we do in Stourport-on-Severn

Get in touch about loading bay doors and dock equipment in Stourport-on-Severn: call, email or use the quote tool.

Call freeGet a quote