- Location
- Redhill, Surrey
- Main postcode district
- RH1
- Nearby (straight line)
- Reigate (2 miles), Horley (5 miles) and Caterham (5 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Why do sites in Redhill choose this?
Split-level buildings near Redhill sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps. Businesses in Redhill receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.
Where ground conditions in Redhill make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option.
We keep the process simple for sites in Redhill. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.
How much does a scissor lift table cost?
A scissor lift table for a loading bay typically costs £9,500 to £28,000 per lift, supplied and installed, excluding VAT. Smaller surface-mounted lifts sit towards the lower end; large, high-capacity pit lifts with gates and bridge plates sit towards the top.
What moves the price:
- Capacity: dock lifts are typically rated somewhere between 2,000 and 6,000 kg, and heavier ratings need a stronger mechanism.
- Platform size and travel: larger platforms and greater lift heights cost more.
- Mounting: pit-mounted or surface-mounted with a ramp.
- Safety equipment: bellows or skirts, toe guards, rails, gates and bridge plates.
- Electrics and access: supply to the power pack, delivery access and out-of-hours working.
Forming a pit, drainage and other groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Asbestos register and any other site hazard information
- Working hours, shift patterns and windows for out-of-hours work
- Drainage on recessed or sloping dock approaches
- Gaps around trailers where heated or chilled air escapes
- Traffic routes for vehicles and separation of pedestrians
- Condition of any existing leveller pit, kerb angles and pit drainage
Options to discuss
Safety bellows and skirts
A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.
Pit-mounted dock lift
Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.
What do the rules in England mean for the work?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Redhill. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about scissor lift tables in Redhill
What details do you need from us to quote for scissor lift tables?
To get started, send the site address in Redhill, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
What warranty comes with new loading bay equipment?
New equipment comes with the manufacturer's warranty, which varies by product. Our workmanship terms are set out in writing in the quote for your Redhill site, so you can see what is covered before you commit. Check the warranty terms for any servicing conditions, and we can quote for planned maintenance once the installation is complete.
How long does installation take at a site in Redhill?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Does a scissor lift table need a pit?
No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.
What capacity of dock lift do I need?
A dock lift needs a capacity above the heaviest combined load it will carry, including the goods, the pallet truck and an operator if they ride on it. Loading bay lifts are typically rated somewhere between 2,000 and 6,000 kg. We work out the right rating from your loads at survey.
Scissor lift tables near Redhill
The same survey, quote and repair service is available in towns around Redhill, such as Reigate (2 miles), Horley (5 miles) and Caterham (5 miles).
Other loading bay services in Redhill
Full guide to scissor lift tables · Everything we do in Redhill
Request a quote for your loading bay in Redhill, attaching photos of the dock, the equipment and any damage.