Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Leatherhead

Scissor lift tables in Leatherhead

Our approach to scissor lift tables in Leatherhead matches the way we work across Surrey: understand the dock first, agree the scope in writing, then manage the job through to a tested handover.

Guide £9,500–£28,000 per lift ex VATFree site surveyKT22
Location
Leatherhead, Surrey
Main postcode district
KT22
Nearby (straight line)
Epsom (4 miles), Dorking (4 miles) and Esher (5 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

Why do sites in Leatherhead choose this?

Sites in Leatherhead replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due. Businesses in Leatherhead receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.

Each lift table enquiry from Leatherhead is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately.

How does an installation in Leatherhead work? First, a free, no-obligation survey to measure up and understand the operation. Next, a fixed written quote. Then a programme agreed with you, so the work fits around deliveries, with out-of-hours slots if needed. The installation itself is carried out by specialist engineers who answer to us, and it finishes with testing, a walk-through for your staff and a handover pack.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

What safety features should a loading bay lift table have?

A loading bay lift table should protect people from the scissor mechanism, stop if anything is trapped under the platform, and stop people or loads falling from the edges. Lift tables are specified to BS EN 1570-1:2024, and common features include:

  • Toe guards: trip bars or sensitive edges around the platform underside that stop the lift descending on contact.
  • Safety bellows or skirts: a flexible enclosure that keeps hands, feet and debris out of shear and crush points.
  • Guard rails and gates: on open sides, sized to how people and pallet trucks move on and off.
  • Bridge plate: a hinged plate that rests on the trailer bed to bridge the gap.
  • Hold-to-run controls: the lift only moves while the button is held, with a stop button within reach.
  • Hydraulic protection: valves that stop the platform dropping if a hose fails.
  • Maintenance props: supports that hold the platform up safely during servicing.
Guide price, Leatherhead
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • How often each door cycles during a typical shift
  • How drivers are prevented from pulling away too early
  • Gaps around trailers where heated or chilled air escapes
  • Yard gradient and the slope of the approach to the dock
  • Control positions, isolators and any existing interlocks
  • Wind exposure at the dock, which affects door and shelter choice

Options to discuss

Pit-mounted dock lift

Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.

Guard rails and gates

Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.

Which rules apply in England?

Sites in Leatherhead fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about scissor lift tables in Leatherhead

Can you work outside our normal operating hours in Leatherhead?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Which building and safety rules apply to a site in Leatherhead?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Leatherhead, we check what applies at survey and design to it.

How long does installation take at a site in Leatherhead?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

What capacity of dock lift do I need?

A dock lift needs a capacity above the heaviest combined load it will carry, including the goods, the pallet truck and an operator if they ride on it. Loading bay lifts are typically rated somewhere between 2,000 and 6,000 kg. We work out the right rating from your loads at survey.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

Scissor lift tables near Leatherhead

We also cover towns near Leatherhead, including Epsom (4 miles), Dorking (4 miles) and Esher (5 miles). Each has its own page with the same services and process.

Other loading bay services in Leatherhead

Full guide to scissor lift tables · Everything we do in Leatherhead

Tell us what is happening at your Leatherhead dock, what equipment is there and when it is used, and we will suggest the right next step.

Call freeGet a quote