A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Where does this fit at a dock in Ashford?
Split-level buildings near Ashford sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps. Sites in Ashford replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.
Food, drink and pharmaceutical sites around Ashford that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
The survey is free, the quote is written and the price is fixed: that is how every installation in Ashford begins. We then manage the work from start to finish. Fitting is carried out by specialist installers under our management, phased so the operation keeps moving, and nights or weekends can be booked by arrangement. On the final day we test the equipment with you and hand over the operating and maintenance information.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
What safety features should a loading bay lift table have?
A loading bay lift table should protect people from the scissor mechanism, stop if anything is trapped under the platform, and stop people or loads falling from the edges. Lift tables are specified to BS EN 1570-1:2024, and common features include:
- Toe guards: trip bars or sensitive edges around the platform underside that stop the lift descending on contact.
- Safety bellows or skirts: a flexible enclosure that keeps hands, feet and debris out of shear and crush points.
- Guard rails and gates: on open sides, sized to how people and pallet trucks move on and off.
- Bridge plate: a hinged plate that rests on the trailer bed to bridge the gap.
- Hold-to-run controls: the lift only moves while the button is held, with a stop button within reach.
- Hydraulic protection: valves that stop the platform dropping if a hose fails.
- Maintenance props: supports that hold the platform up safely during servicing.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Traffic routes for vehicles and separation of pedestrians
- How often each door cycles during a typical shift
- Wheel guide positions and yard markings for reversing vehicles
- Forklift and pallet truck loads crossing the leveller platform
- Yard gradient and the slope of the approach to the dock
- Wall and steel structure for door, shelter and bumper fixings
Options to discuss
Bridge plate
A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.
Safety bellows and skirts
A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.
What do the rules in England mean for the work?
Sites in Ashford fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about scissor lift tables in Ashford
Do you remove and dispose of the old equipment?
Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Ashford, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.
Can you work alongside our main contractor on a new build in Ashford?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
Is VAT included in your guide prices for scissor lift tables?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Surrey as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Can a forklift drive on to a scissor lift table?
Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.
Scissor lift tables near Ashford
We also cover towns near Ashford, including Staines (2 miles), Feltham (2 miles) and Sunbury-on-Thames (3 miles). Each has its own page with the same services and process.
Other loading bay services in Ashford
Full guide to scissor lift tables · Everything we do in Ashford
For a written price on loading bay work in Ashford, request a quote and include photos of the bay if you can.