- Location
- Doncaster, South Yorkshire
- Main postcode districts
- DN1 and DN2
- Nearby (straight line)
- Bentley (1 mile), Adwick le Street (4 miles) and Conisbrough (5 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Why do sites in Doncaster choose this?
Town-centre and retail sites around Doncaster with little yard space often choose a dock lift because a recessed approach ramp would take up too much room. Businesses in Doncaster receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening.
Food, drink and pharmaceutical sites around Doncaster that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
Step one is a survey at your site in Doncaster, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.
Operators sending trailers to and from Doncaster may already know this: iPort Doncaster, a rail-connected logistics park, sits near junction 3 of the M18. Regardless of traffic volume, a dock must seal, level and hold vehicles safely.
How much does a scissor lift table cost?
A scissor lift table for a loading bay typically costs £9,500 to £28,000 per lift, supplied and installed, excluding VAT. Smaller surface-mounted lifts sit towards the lower end; large, high-capacity pit lifts with gates and bridge plates sit towards the top.
What moves the price:
- Capacity: dock lifts are typically rated somewhere between 2,000 and 6,000 kg, and heavier ratings need a stronger mechanism.
- Platform size and travel: larger platforms and greater lift heights cost more.
- Mounting: pit-mounted or surface-mounted with a ramp.
- Safety equipment: bellows or skirts, toe guards, rails, gates and bridge plates.
- Electrics and access: supply to the power pack, delivery access and out-of-hours working.
Forming a pit, drainage and other groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.
What inspections does a scissor lift table need under LOLER?
A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.
In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.
Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.
We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Working hours, shift patterns and windows for out-of-hours work
- Clear opening width and height for each door
- Escape routes and pedestrian doors close to the bay
- Access for deliveries, cranes or lifting equipment during installation
- How often each door cycles during a typical shift
- Yard gradient and the slope of the approach to the dock
Options to discuss
Bridge plate
A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.
Surface-mounted lift table
Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.
Planning, building control and safety law in England
Workplace safety in England is regulated by HSE. For a loading bay in Doncaster, that means doors meeting regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, equipment maintained under PUWER and suitable safeguards against vehicles driving away too early. We check what applies at survey and design the bay accordingly.
Questions about scissor lift tables in Doncaster
Which building and safety rules apply to a site in Doncaster?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Doncaster, we check what applies at survey and design to it.
Do you cover Doncaster for scissor lift tables?
Yes. We take on scissor lift tables for businesses in Doncaster and across South Yorkshire. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
Can you work outside our normal operating hours in Doncaster?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Can a forklift drive on to a scissor lift table?
Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.
Scissor lift tables near Doncaster
If your site is not in Doncaster itself, it may be near one of these: Bentley (1 mile), Adwick le Street (4 miles) and Conisbrough (5 miles). Pick the closest.
Other loading bay services in Doncaster
Full guide to scissor lift tables · Everything we do in Doncaster
Send a few photos of the dock and a short description of the problem, and we will come back to you about your Doncaster site.
