- Location
- Rochester, Kent
- Main postcode district
- ME1
- Nearby (straight line)
- Chatham (1 mile), Strood (1 mile) and Gillingham (2 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
What matters for scissor lift tables in Rochester?
Businesses in Rochester receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening. Older industrial buildings in Rochester built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.
Where ground conditions in Rochester make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option.
If you are planning scissor lift tables for a site in Rochester, expect four stages. A free survey and fixed written quote come first. We then agree a programme with you, including any out-of-hours work. Specialist installation engineers carry out the installation under our management, with us as your single point of contact. Finally, the equipment is tested, your staff are shown how it works and everything is handed over with its documentation.
Where are scissor lift tables used at loading bays?
Scissor lift tables are used wherever goods need to move between yard level and trailer height without a raised dock. They are a common answer for buildings that were never designed for articulated trailers.
- Ground-level doors: older units, workshops and retail back doors with no dock.
- Mixed fleets: the same lift can serve a van, a rigid lorry and an articulated trailer at different bed heights, typically from around 900 mm to 1,600 mm.
- Tight sites: where there is no room for a recessed approach ramp in the yard.
- Split levels: inside buildings with floors at different heights.
- Supplementing a dock: one lift beside a row of docks to handle vehicles that do not suit the levellers.
Our guide to converting a ground-level door into a loading dock compares lift tables with the other ways of reaching trailer height.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- How drivers are prevented from pulling away too early
- Working hours, shift patterns and windows for out-of-hours work
- Wheel guide positions and yard markings for reversing vehicles
- Control positions, isolators and any existing interlocks
- Scope to convert ground-level doors into docks or add lift tables
- Condition of any existing leveller pit, kerb angles and pit drainage
Options to discuss
Bridge plate
A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.
Safety bellows and skirts
A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.
Planning, building control and safety law in England
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Rochester. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about scissor lift tables in Rochester
What details do you need from us to quote for scissor lift tables?
To get started, send the site address in Rochester, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
How long does installation take at a site in Rochester?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Is the site survey in Rochester free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
Can a scissor lift table be installed outdoors?
Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Scissor lift tables near Rochester
Other towns within reach of Rochester on our coverage list include Chatham (1 mile), Strood (1 mile) and Gillingham (2 miles), all covered on the same terms.
Other loading bay services in Rochester
Full guide to scissor lift tables · Everything we do in Rochester
Tell us what is happening at your Rochester dock, what equipment is there and when it is used, and we will suggest the right next step.