A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
Where does this fit at a dock in Stretford?
Each lift table enquiry from Stretford is surveyed and quoted in the same way as any other UK site, with groundworks for a pit priced separately. Food, drink and pharmaceutical sites around Stretford that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
Split-level buildings near Stretford sometimes use scissor lift tables internally to move pallets between floor levels without relying on forklifts and ramps.
Here is what happens after you contact us about a site in Stretford. We arrange a free survey, measure up and send a fixed written quote. If you go ahead, we manage the whole job, including ordering, delivery and coordination with your site team. Specialist installation engineers working under our management do the fitting, at times built around your loading schedule, with out-of-hours work by arrangement. Testing and handover documents close the job.
Worth knowing if you run a loading operation from Stretford or nearby: Trafford Park, one of the largest industrial estates in Europe, is next door. When specifying a bay, the trailer mix and dock height are what count.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
Where are scissor lift tables used at loading bays?
Scissor lift tables are used wherever goods need to move between yard level and trailer height without a raised dock. They are a common answer for buildings that were never designed for articulated trailers.
- Ground-level doors: older units, workshops and retail back doors with no dock.
- Mixed fleets: the same lift can serve a van, a rigid lorry and an articulated trailer at different bed heights, typically from around 900 mm to 1,600 mm.
- Tight sites: where there is no room for a recessed approach ramp in the yard.
- Split levels: inside buildings with floors at different heights.
- Supplementing a dock: one lift beside a row of docks to handle vehicles that do not suit the levellers.
Our guide to converting a ground-level door into a loading dock compares lift tables with the other ways of reaching trailer height.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Wall and steel structure for door, shelter and bumper fixings
- Condition of any existing leveller pit, kerb angles and pit drainage
- Headroom above the opening and which track type will suit it
- Control positions, isolators and any existing interlocks
- Lighting inside trailers and at the dock face
- Asbestos register and any other site hazard information
Options to discuss
Safety bellows and skirts
A flexible enclosure around the scissor mechanism that keeps hands, feet and debris out of shear and crush points, and helps keep the mechanism clean.
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Which rules apply in England?
Lift tables and dock lifts in Stretford may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about scissor lift tables in Stretford
Can you work outside our normal operating hours in Stretford?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
What details do you need from us to quote for scissor lift tables?
To get started, send the site address in Stretford, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Can you work alongside our main contractor on a new build in Stretford?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
How often does a lift table need servicing?
A lift table needs routine maintenance as well as its LOLER thorough examinations. Many sites combine the two so the lift is serviced shortly before each examination. The right maintenance frequency depends on how heavily the lift is used, and we agree it with you at handover.
What capacity of dock lift do I need?
A dock lift needs a capacity above the heaviest combined load it will carry, including the goods, the pallet truck and an operator if they ride on it. Loading bay lifts are typically rated somewhere between 2,000 and 6,000 kg. We work out the right rating from your loads at survey.
Scissor lift tables near Stretford
Other towns within reach of Stretford on our coverage list include Urmston (2 miles), Sale (2 miles) and Eccles (2 miles), all covered on the same terms.
Other loading bay services in Stretford
Full guide to scissor lift tables · Everything we do in Stretford
Get in touch about loading bay doors and dock equipment in Stretford: call, email or use the quote tool.