Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Billericay

Scissor lift tables in Billericay

Talk to us about scissor lift tables in Billericay. We cover Essex and can advise on the right approach for your doors, levellers, shelters and dock safety equipment.

Guide £9,500–£28,000 per lift ex VATFree site surveyCM11
Location
Billericay, Essex
Main postcode district
CM11
Nearby (straight line)
Basildon (4 miles), Wickford (5 miles) and Brentwood (5 miles)
Survey and quote
Free, with a fixed written quote
Scissor lift tables, in short

A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.

Why do sites in Billericay choose this?

Older industrial buildings in Billericay built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard. Sites in Billericay replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.

Where ground conditions in Billericay make a deep recessed dock costly, a pit-mounted or surface-mounted lift table can be the more practical option.

We keep the process simple for sites in Billericay. A free survey tells us what the dock needs; a fixed written quote tells you what it will cost and what is included. We then organise the installation, with specialist engineers under our management and a programme agreed around your shifts. Night and weekend work is available by arrangement. Before we leave, the new equipment is tested, demonstrated and handed over with its documentation.

What happens on site when a dock lift is installed?

Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.

  1. Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
  2. Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
  3. Power and controls: the power pack and control station are connected to the supply confirmed at survey.
  4. Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
  5. Handover: operators are shown how to use it, and the documents and examination regime are explained.

We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.

What inspections does a scissor lift table need under LOLER?

A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.

In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.

Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.

We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.

Guide price, Billericay
£9,500–£28,000 per lift, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What do we check at the survey?

  • Access for deliveries, cranes or lifting equipment during installation
  • Wheel guide positions and yard markings for reversing vehicles
  • Dock height and the mix of trailers you load
  • Working hours, shift patterns and windows for out-of-hours work
  • Condition of any existing leveller pit, kerb angles and pit drainage
  • Yard gradient and the slope of the approach to the dock

Options to discuss

Guard rails and gates

Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.

Surface-mounted lift table

Stands on the existing floor with a short ramp on to the platform at its lowest height. No excavation, a quicker install and easier to relocate later.

What do the rules in England mean for the work?

Sites in Billericay fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.

Questions about scissor lift tables in Billericay

How long does installation take at a site in Billericay?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Will you deal with building control and planning for a project in Billericay?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Is VAT included in your guide prices for scissor lift tables?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Essex as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Can a forklift drive on to a scissor lift table?

Only if the lift has been designed and rated for forklift traffic. Most loading bay lift tables are built for pallet trucks, and a forklift's weight and wheel loads need a much heavier platform and mechanism. Tell us how you load at survey so the lift is specified correctly.

Does a scissor lift table need a pit?

No, a scissor lift table does not always need a pit. Surface-mounted lifts stand on the existing floor with a short ramp at the bottom. A pit lets the platform sit flush with the yard so pallet trucks roll straight on, which suits frequent or heavy loading. We recommend one or the other at survey.

Scissor lift tables near Billericay

Close neighbours of Billericay with their own pages here: Basildon (4 miles), Wickford (5 miles) and Brentwood (5 miles). Choose one to see coverage details for that town.

Other loading bay services in Billericay

Full guide to scissor lift tables · Everything we do in Billericay

Speak to us about your Billericay loading bay. We will ask the right questions, then set out the next step clearly.

Call freeGet a quote