- Location
- Dorchester, Dorset
- Main postcode district
- DT1
- Nearby (straight line)
- Weymouth (7 miles), Yeovil (18 miles) and Poole (20 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
What should sites in Dorchester consider?
Businesses in Dorchester receiving both vans and articulated trailers through one doorway can use a lift table to serve every bed height from the same opening. Food, drink and pharmaceutical sites around Dorchester that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
Sites in Dorchester replacing an ageing dock lift should look at its LOLER examination history, as repeated defects can signal that replacement is due.
Step one is a survey at your site in Dorchester, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.
How much does a scissor lift table cost?
A scissor lift table for a loading bay typically costs £9,500 to £28,000 per lift, supplied and installed, excluding VAT. Smaller surface-mounted lifts sit towards the lower end; large, high-capacity pit lifts with gates and bridge plates sit towards the top.
What moves the price:
- Capacity: dock lifts are typically rated somewhere between 2,000 and 6,000 kg, and heavier ratings need a stronger mechanism.
- Platform size and travel: larger platforms and greater lift heights cost more.
- Mounting: pit-mounted or surface-mounted with a ramp.
- Safety equipment: bellows or skirts, toe guards, rails, gates and bridge plates.
- Electrics and access: supply to the power pack, delivery access and out-of-hours working.
Forming a pit, drainage and other groundworks are priced separately after survey. Following a free site survey, the written quote is the fixed price. VAT is added at the standard rate.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Lighting inside trailers and at the dock face
- Traffic routes for vehicles and separation of pedestrians
- How often each door cycles during a typical shift
- Gaps around trailers where heated or chilled air escapes
- Forklift and pallet truck loads crossing the leveller platform
- Control positions, isolators and any existing interlocks
Options to discuss
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Bridge plate
A hinged plate on the platform end that rests on the trailer bed during loading, bridging the gap so pallet trucks can cross smoothly between lift and trailer.
Planning, building control and safety law in England
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Dorchester. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about scissor lift tables in Dorchester
Is the site survey in Dorchester free?
Yes. For new installations, replacements, upgrades, conversions and complete bays, the site survey and written quote are free and come with no obligation. The survey lets us measure the openings, check the dock and structure, and understand how the bay is used, so the quote reflects your site. Repair and servicing visits are different: they are chargeable, with the price agreed before anyone attends.
What details do you need from us to quote for scissor lift tables?
To get started, send the site address in Dorchester, the number of bays or openings, approximate sizes, and photos of the dock from inside and outside. Tell us what vehicles you load, what goods you handle and any temperature requirements. Drawings help on new builds. We then arrange the free survey and confirm the details before the written quote is issued.
Will you deal with building control and planning for a project in Dorchester?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
How often does a lift table need servicing?
A lift table needs routine maintenance as well as its LOLER thorough examinations. Many sites combine the two so the lift is serviced shortly before each examination. The right maintenance frequency depends on how heavily the lift is used, and we agree it with you at handover.
Can a scissor lift table be installed outdoors?
Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.
Scissor lift tables near Dorchester
Other towns within reach of Dorchester on our coverage list include Weymouth (7 miles), Yeovil (18 miles) and Poole (20 miles), all covered on the same terms.
Other loading bay services in Dorchester
Full guide to scissor lift tables · Everything we do in Dorchester
Speak to us about your Dorchester loading bay. We will ask the right questions, then set out the next step clearly.