- Location
- Ascot, Berkshire
- Main postcode district
- SL5
- Nearby (straight line)
- Bracknell (3 miles), Egham (5 miles) and Crowthorne (6 miles)
- Survey and quote
- Free, with a fixed written quote
A scissor lift table, often called a dock lift, is a powered platform raised and lowered by a hydraulic scissor mechanism to move goods between two levels. At a loading bay it lifts pallets and pallet trucks from ground level to the height of a trailer bed, making it a practical alternative to a raised dock where forming one is not possible.
How does this suit sites in Ascot?
Town-centre and retail sites around Ascot with little yard space often choose a dock lift because a recessed approach ramp would take up too much room. Food, drink and pharmaceutical sites around Ascot that need clean, controlled loading points may prefer a lift table with bellows enclosing the scissor mechanism.
Older industrial buildings in Ascot built with ground-level doors only can use a scissor lift table to load trailers without excavating the yard.
Step one is a survey at your site in Ascot, which costs nothing and carries no obligation. Step two is a written quote with a fixed price and a clear scope. Step three is installation, scheduled around your operation and carried out by specialist installation engineers working under our management, including evenings or weekends if agreed. Step four is handover, when the equipment is tested in front of you and the paperwork is passed over.
What inspections does a scissor lift table need under LOLER?
A scissor lift table is lifting equipment, so it needs a thorough examination under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) at least every 12 months. If it lifts people, such as an operator riding with a pallet truck, the interval is every 6 months, unless a competent person draws up a written examination scheme instead. Which applies depends on the equipment and how it is used; your insurer or competent person will confirm.
In Northern Ireland the equivalent is LOLER (Northern Ireland) 1999, and the regulator is HSENI rather than HSE.
Thorough examination is separate from routine maintenance. The lift is also work equipment under PUWER, so it must be maintained in a safe condition between examinations.
We specify lift tables to BS EN 1570-1:2024, the current safety standard for lifting tables, and explain the examination regime at handover. Planned loading bay servicing can be arranged to fit around the examination dates.
What happens on site when a dock lift is installed?
Installing a dock lift takes the doorway out of use while any pit is formed and the lift fitted, so an alternative loading point should be planned for that period.
- Pit works: where a pit is needed, the yard is broken out, the pit formed and drained, and the concrete left to cure.
- Delivery and positioning: the lift is offloaded and set in place by forklift or crane, then levelled and fixed.
- Power and controls: the power pack and control station are connected to the supply confirmed at survey.
- Testing: the lift is run through its full travel, safety devices are checked and it is tested under load.
- Handover: operators are shown how to use it, and the documents and examination regime are explained.
We ask you to provide a delivery route, a cleared working area, the electrical supply, any drawings of buried services and a contact on site.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Forklift and pallet truck loads crossing the leveller platform
- Power supply at each bay, including three-phase availability
- Age and condition of the equipment already in place
- How drivers are prevented from pulling away too early
- Temperature requirements for chilled, frozen or ambient goods
- Wind exposure at the dock, which affects door and shelter choice
Options to discuss
Guard rails and gates
Fixed rails and gated sides around the platform, arranged to suit the goods and how operators and pallet trucks move on and off the lift.
Pit-mounted dock lift
Set in a concrete pit so the platform lowers flush with the yard, letting pallet trucks drive straight on. The best choice for frequent, heavy loading at a fixed door.
Which rules apply in England?
Sites in Ascot fall under the rules for England. Structural changes such as forming a new opening or a dock leveller pit may need Building Regulations approval, and external structures such as loading houses, canopies or new dock approaches can need planning permission from the local planning authority. We check what applies at survey and build any approvals into the plan.
Questions about scissor lift tables in Ascot
How do you price scissor lift tables for a site in Ascot?
Guide budgets for supply and fit are £9,500 to £28,000 per lift, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.
Which building and safety rules apply to a site in Ascot?
It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Ascot, we check what applies at survey and design to it.
Is VAT included in your guide prices for scissor lift tables?
No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in Berkshire as everywhere else: for scissor lift tables, it is £9,500 to £28,000 per lift, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.
Can people ride on a dock lift?
Some lift tables are designed to carry an operator with the load, and others are for goods only. If the lift carries people, LOLER thorough examinations are typically needed every 6 months rather than every 12, unless a written examination scheme sets a different interval. Your insurer or competent person will confirm.
Can a scissor lift table be installed outdoors?
Yes, scissor lift tables are often installed outdoors at the loading door. Outdoor lifts need a drained pit or a suitable base, weather-resistant finishes and controls, and sometimes a canopy over the loading area. A canopy is an external structure that may need planning permission, which we check at survey.
Scissor lift tables near Ascot
Sites close to Ascot get the same service, including those in Bracknell (3 miles), Egham (5 miles) and Crowthorne (6 miles), with every job run the same way.
Other loading bay services in Ascot
Full guide to scissor lift tables · Everything we do in Ascot
Get in touch about loading bay doors and dock equipment in Ascot: call, email or use the quote tool.