Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Brighouse

Loading houses in Brighouse

Warehouse, factory and trade sites in Brighouse can bring requests for loading houses to us, and we organise the work in a way that suits how the site operates.

Guide £14,500–£32,000 per house ex VATFree site surveyHD6
Location
Brighouse, West Yorkshire
Main postcode district
HD6
Nearby (straight line)
Halifax (3 miles), Cleckheaton (3 miles) and Liversedge (4 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Is this right for your site in Brighouse?

Manufacturing businesses around Brighouse adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside. Racked warehouses around Brighouse that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

Where a yard in Brighouse is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.

Any project involving loading houses at a working site in Brighouse takes planning. We survey free of charge, quote a fixed price in writing, and then agree a programme that keeps as much of the dock running as possible. Specialist installation engineers carry out the work under our management, out of hours if that suits you better. On completion we test each item, show your team how it operates and leave the documentation with you.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Can a loading house be added to an existing building?

Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.

At survey we check:

  • the floor height inside against the yard level outside;
  • whether an existing door opening can be used, or a new one formed in the cladding or masonry;
  • drains, ducts and other buried services where foundations will go;
  • the space trailers need to manoeuvre, and whether an angled house would work better;
  • any planning or building control approval the project may need.

Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.

Guide price, Brighouse
£14,500–£32,000 per house, ex VAT

The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.

What we look at on site

  • Yard gradient and the slope of the approach to the dock
  • Forklift and pallet truck loads crossing the leveller platform
  • Wind exposure at the dock, which affects door and shelter choice
  • Age and condition of the equipment already in place
  • Headroom above the opening and which track type will suit it
  • Bumper position and wear or damage on the dock face

Options to discuss

Straight loading house

Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

Regulations and approvals in England

Lift tables and dock lifts in Brighouse may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.

Questions about loading houses in Brighouse

Will you deal with building control and planning for a project in Brighouse?

We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.

Is VAT included in your guide prices for loading houses?

No. Our customers are businesses, so guide prices exclude VAT, which is added at the standard rate. The same guide range applies in West Yorkshire as everywhere else: for loading houses, it is £14,500 to £32,000 per house, excluding VAT. It covers supply and fit for a typical installation. Your fixed written quote after the free survey shows the net price, the VAT and exactly what is included.

Which building and safety rules apply to a site in Brighouse?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Brighouse, we check what applies at survey and design to it.

Is a loading house cheaper than forming an internal pit?

Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

Loading houses near Brighouse

Sites close to Brighouse get the same service, including those in Halifax (3 miles), Cleckheaton (3 miles) and Liversedge (4 miles), with every job run the same way.

Other loading bay services in Brighouse

Full guide to loading houses · Everything we do in Brighouse

Start your enquiry for Brighouse through the quote tool. A few photos and approximate sizes help us respond with something useful.

Call freeGet a quote