- Location
- Burgess Hill, West Sussex
- Main postcode district
- RH15
- Nearby (straight line)
- Haywards Heath (3 miles), Lewes (8 miles) and Portslade (9 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
How does this suit sites in Burgess Hill?
For older buildings in Burgess Hill with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations. Racked warehouses around Burgess Hill that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
Where a yard in Burgess Hill is narrow, an angled loading house lets trailers approach on a diagonal and can sometimes fit more bays along one wall.
Your loading bay stays our responsibility from the survey to the handover. In Burgess Hill, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
How much does a loading house cost?
A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.
What moves the price:
- Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
- Foundations: ground conditions and buried services decide the size of pads or footings.
- Building works: forming or enlarging the wall opening, and a new insulated door if needed.
- Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.
These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What we look at on site
- Wheel guide positions and yard markings for reversing vehicles
- Escape routes and pedestrian doors close to the bay
- Traffic routes for vehicles and separation of pedestrians
- How drivers are prevented from pulling away too early
- Whether planning, building control or a building warrant may be needed
- How often each door cycles during a typical shift
Options to discuss
Angled loading house
Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Regulations and approvals in England
Lift tables and dock lifts in Burgess Hill may fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted. It depends on the equipment and how it is used, and your insurer or competent person will confirm. Dock levellers are usually treated as work equipment under PUWER. We check what applies at survey.
Questions about loading houses in Burgess Hill
Can you work outside our normal operating hours in Burgess Hill?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Can you work alongside our main contractor on a new build in Burgess Hill?
Yes. For new warehouses and fit-outs, we can supply and install the dock package as part of a wider project, working to the main contractor's programme, site rules and permits. We will need drawings, dock levels and the programme, and we coordinate pit details, power supplies and door openings with the relevant trades before installation begins.
How long does installation take at a site in Burgess Hill?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Is a loading house cheaper than forming an internal pit?
Not always. A loading house includes a whole steel structure, so the equipment cost is higher, but it avoids breaking out the slab and losing internal floor space. The best comparison is made at survey, taking account of racking, services under the floor and how the building will be used.
Does a loading house need planning permission?
A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.
Loading houses near Burgess Hill
Looking beyond Burgess Hill? Our pages for Haywards Heath (3 miles), Lewes (8 miles) and Portslade (9 miles) describe the same loading bay services and how to get in touch.
Other loading bay services in Burgess Hill
Full guide to loading houses · Everything we do in Burgess Hill
Speak to us about your Burgess Hill loading bay. We will ask the right questions, then set out the next step clearly.
