We look after loading houses for warehouses and factories in Hawick, planning the work around deliveries and collections so that the dock stays as available as possible.

Guide £14,500–£32,000 per house ex VATFree site surveyTD9
Location
Hawick, Scottish Borders
Main postcode district
TD9
Nearby (straight line)
Galashiels (13 miles) and Peebles (22 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

Where does this fit at a dock in Hawick?

For older buildings in Hawick with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations. Units in Hawick with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house.

Any loading house proposed in Hawick needs its planning and building control position checked, which we look at during the site survey before quoting.

We never ask you to commit before you have a fixed price. A free survey at your Hawick site comes first, followed by a written quote. When the order goes ahead, we plan the installation around your operation, book any out-of-hours working you need and manage the specialist installation engineers on site. The job ends with a full test, a run-through for the people who will use the equipment and a set of handover documents.

What happens on site when a loading house is installed?

Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.

  1. Foundations: concrete pads or footings are formed in the yard and left to cure.
  2. Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
  3. Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
  4. Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
  5. Commissioning: everything is tested with a trailer before handover.

We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.

Does a loading house need planning permission or building approval?

A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.

Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.

Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.

The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.

Guide price, Hawick
£14,500–£32,000 per house, ex VAT

The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.

What does the free survey cover?

  • Drainage on recessed or sloping dock approaches
  • Wheel guide positions and yard markings for reversing vehicles
  • Whether planning, building control or a building warrant may be needed
  • Bumper position and wear or damage on the dock face
  • Headroom above the opening and which track type will suit it
  • Access for deliveries, cranes or lifting equipment during installation

Options to discuss

Angled loading house

Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

What do the rules in Scotland mean for the work?

Energy standards for buildings in Scotland are set out in Section 6 of the Building Standards Technical Handbook. For new or replacement loading bay doors in Hawick, we confirm the figure that applies to your project and check what applies at survey, rather than relying on rules written for elsewhere in the UK.

Questions about loading houses in Hawick

Which building and safety rules apply to a site in Hawick?

It depends on which UK nation the site is in. England and Wales use Building Regulations approval, Scotland uses building warrants and Northern Ireland uses building control approval from the council. Workplace safety is regulated by HSE in Great Britain and HSENI in Northern Ireland, and energy rules differ between nations. For your site in Hawick, we check what applies at survey and design to it.

How long does installation take at a site in Hawick?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

How do you price loading houses for a site in Hawick?

Guide budgets for supply and fit are £14,500 to £32,000 per house, excluding VAT. The figure moves with size, insulation, the operator, electrics, access, any pit or groundworks and out-of-hours working. Where levellers are involved, the guide assumes an existing, sound pit. After the free survey you receive a fixed written quote, and that is the price for the agreed scope.

What door is used with a loading house?

The building wall behind a loading house usually has an insulated sectional door, which closes the building at the wall line when no trailer is docked. An existing door can sometimes be kept if it is in good condition. In England, replacement doors need to meet the Approved Document L limiting U-value for large doors.

How long does a loading house take to install?

The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.

Loading houses near Hawick

Other towns within reach of Hawick on our coverage list include Galashiels (13 miles) and Peebles (22 miles), all covered on the same terms.

Other loading bay services in Hawick

Full guide to loading houses · Everything we do in Hawick

Start your enquiry for Hawick through the quote tool. A few photos and approximate sizes help us respond with something useful.

Call freeGet a quote