- Location
- Lerwick, Orkney, Shetland and the Western Isles
- Main postcode district
- ZE1
- Nearby (straight line)
- Remote location, covered by arrangement
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
What matters for loading houses in Lerwick?
Units in Lerwick with floors at dock height but no room for an internal leveller pit are typical candidates for an external loading house. Chilled stores near Lerwick sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked.
Racked warehouses around Lerwick that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
Our part of the job in Lerwick is to survey, quote and manage; the fitting itself is done by specialist installation engineers working under our management. The survey and the written quote are free. Once the fixed price is accepted, we agree dates that work around your deliveries and shifts, including out-of-hours working where needed. Every installation is tested before handover, and you receive the documentation for each item fitted.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
The same published guide range applies across Scotland; access, out-of-hours working and site conditions are confirmed at the free survey.
Survey checklist for your dock
- Age and condition of the equipment already in place
- Control positions, isolators and any existing interlocks
- Traffic routes for vehicles and separation of pedestrians
- Forklift and pallet truck loads crossing the leveller platform
- Scope to convert ground-level doors into docks or add lift tables
- Wind exposure at the dock, which affects door and shelter choice
Options to discuss
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Leveller choice
A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.
Which rules apply in Scotland?
HSE is the workplace safety regulator in Scotland. At a loading bay in Lerwick, doors need to satisfy regulation 18 of the Workplace (Health, Safety and Welfare) Regulations 1992, dock equipment must be kept safe under PUWER, and drivers must be prevented from pulling away too early. We check what applies at survey.
We cover Lerwick by arrangement. The survey and written quote stay free: for remote and island sites we often start from your photos, drawings and a video call, then confirm measurements on site. Travel and any accommodation needed for the installation are shown as separate lines in the fixed quote.
Questions about loading houses in Lerwick
Do you cover Lerwick for loading houses?
Yes. We take on loading houses for businesses in Lerwick and across Orkney, Shetland and the Western Isles. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
How long does installation take at a site in Lerwick?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Can you work outside our normal operating hours in Lerwick?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Does a loading house need planning permission?
A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.
Can a loading house be used for a cold store?
Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.
Loading houses near Lerwick
Other loading bay services in Lerwick
Full guide to loading houses · Everything we do in Lerwick
Start your enquiry for Lerwick through the quote tool. A few photos and approximate sizes help us respond with something useful.
