- Location
- Pontypridd, Mid Glamorgan
- Main postcode district
- CF37
- Nearby (straight line)
- Caerphilly (6 miles), Rhondda (6 miles) and Blackwood (7 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Is this right for your site in Pontypridd?
For older buildings in Pontypridd with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations. Racked warehouses around Pontypridd that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.
Any loading house proposed in Pontypridd needs its planning and building control position checked, which we look at during the site survey before quoting.
It starts with a free site survey in Pontypridd, where we measure the openings, check the dock and talk through how the bay is used. You then receive a fixed written quote. Once you accept, we manage the job: specialist installation engineers carry out the work under our management, planned around your deliveries, and out-of-hours working can be arranged. At handover we test everything with you and leave the documentation.
How much does a loading house cost?
A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.
What moves the price:
- Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
- Leveller type: telescopic-lip levellers cost more than swing-lip.
- Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
- Foundations: ground conditions and buried services decide the size of pads or footings.
- Building works: forming or enlarging the wall opening, and a new insulated door if needed.
- Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.
These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.
What happens on site when a loading house is installed?
Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.
- Foundations: concrete pads or footings are formed in the yard and left to cure.
- Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
- Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
- Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
- Commissioning: everything is tested with a trailer before handover.
We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.
The same published guide range applies across Wales; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- How often each door cycles during a typical shift
- Access for deliveries, cranes or lifting equipment during installation
- Age and condition of the equipment already in place
- Wall and steel structure for door, shelter and bumper fixings
- Control positions, isolators and any existing interlocks
- Working hours, shift patterns and windows for out-of-hours work
Options to discuss
Straight loading house
Set square to the building wall, the simplest layout where the yard has room for trailers to reverse straight in. Usually the most economical arrangement for one or more bays.
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
What do the rules in Wales mean for the work?
Scissor lift tables and dock lifts in Wales can fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted, depending on the equipment and its use. For sites in Pontypridd, your insurer or competent person will confirm the regime, and we check what applies at survey.
Questions about loading houses in Pontypridd
Can you work outside our normal operating hours in Pontypridd?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
Will you deal with building control and planning for a project in Pontypridd?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Do you cover Pontypridd for loading houses?
Yes. We take on loading houses for businesses in Pontypridd and across Mid Glamorgan. We survey the site, provide a fixed written quote and manage the installation, with specialist installation engineers working under our management. Visits are arranged in advance at a time that suits your operation, and the same single contact stays with the job through to handover.
Does a loading house need planning permission?
A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.
Can a loading house be moved later?
Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.
Loading houses near Pontypridd
Businesses outside Pontypridd may find their nearest town in this list: Caerphilly (6 miles), Rhondda (6 miles) and Blackwood (7 miles). Each page covers doors, docks, repairs and servicing.
Other loading bay services in Pontypridd
Full guide to loading houses · Everything we do in Pontypridd
Have photos of the door, leveller or shelter? Send them with your enquiry and we can give a clearer answer for your Pontypridd site.
