Loading bay doors and dock equipment, UK-wideFree site survey for new docks and upgradesRepair visits priced before we attend
Call free 0800 088 6248
Lifts and loading houses · Maesteg

Loading houses in Maesteg

In Maesteg, as in other parts of Mid Glamorgan, we offer loading houses with clear communication, careful planning and work organised around your operation.

Guide £14,500–£32,000 per house ex VATFree site surveyCF34
Location
Maesteg, Mid Glamorgan
Main postcode district
CF34
Nearby (straight line)
Briton Ferry (7 miles), Neath (7 miles) and Bridgend (8 miles)
Survey and quote
Free, with a fixed written quote
Loading houses, in short

A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.

What should sites in Maesteg consider?

Developers bringing forward industrial units in Maesteg can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit. Racked warehouses around Maesteg that cannot spare internal floor space for a dock can move the leveller outside the wall into a loading house instead.

For older buildings in Maesteg with a raised floor and little internal space by the wall, an external house can provide a modern hydraulic dock without major alterations.

Before anything is ordered, we visit your site in Maesteg for a free survey and then send a written quote with a fixed price. From that point we manage the installation, coordinating delivery, access and any other trades. Fitting is done by specialist installation engineers engaged and managed by us, at times that suit your operation, including out of hours where agreed. You get a tested installation, a demonstration for your team and the manufacturer documentation.

How much does a loading house cost?

A loading house typically costs £14,500 to £32,000 per house, supplied and installed, excluding VAT. That covers the insulated structure with its leveller and shelter or seal; the figure for your site depends on size, layout and what has to happen to the building and yard.

What moves the price:

  • Size and layout: straight houses are simpler than angled ones, and larger houses use more steel and panel.
  • Leveller type: telescopic-lip levellers cost more than swing-lip.
  • Front sealing: inflatable shelters cost more than retractable shelters or foam seals.
  • Foundations: ground conditions and buried services decide the size of pads or footings.
  • Building works: forming or enlarging the wall opening, and a new insulated door if needed.
  • Electrics and access: supply to the leveller and lights, crane access and any out-of-hours working.

These are guide budgets. After a free site survey we send a written quote that is the fixed price. VAT is added at the standard rate.

What happens on site when a loading house is installed?

Installing a loading house takes the bay out of use from the foundation works to commissioning, but the building can stay secure because the existing wall and door remain until late in the job.

  1. Foundations: concrete pads or footings are formed in the yard and left to cure.
  2. Erection: the steel frame is lifted into place, usually by crane, and fixed to the foundations and building.
  3. Cladding and equipment: panels, leveller, shelter or seal, bumpers and lights are fitted.
  4. Door and electrics: the building door is fitted or adapted and the leveller and lights connected.
  5. Commissioning: everything is tested with a trailer before handover.

We ask you to provide yard space for the crane and deliveries, any drawings of drains or buried services, a power supply, and clear arrangements for keeping vehicles and people away from the lifting zone. Neighbouring bays may need to close briefly while the crane is working.

Guide price, Maesteg
£14,500–£32,000 per house, ex VAT

The same published guide range applies across Wales; access, out-of-hours working and site conditions are confirmed at the free survey.

Survey checklist for your dock

  • Bumper position and wear or damage on the dock face
  • Traffic routes for vehicles and separation of pedestrians
  • Forklift and pallet truck loads crossing the leveller platform
  • Wheel guide positions and yard markings for reversing vehicles
  • How drivers are prevented from pulling away too early
  • Control positions, isolators and any existing interlocks

Options to discuss

Leveller choice

A hydraulic swing-lip leveller for general trailer loading, or a telescopic-lip leveller for precise placement, end-loading and trailers that cannot be reversed tight to the dock.

Shelter or seal front

A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.

What do the rules in Wales mean for the work?

Scissor lift tables and dock lifts in Wales can fall under LOLER, with thorough examination at least every 12 months, or every 6 months where people are lifted, depending on the equipment and its use. For sites in Maesteg, your insurer or competent person will confirm the regime, and we check what applies at survey.

Questions about loading houses in Maesteg

Can you work outside our normal operating hours in Maesteg?

Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.

Do you remove and dispose of the old equipment?

Yes, where it is part of the scope. When we replace doors, levellers, shelters or seals at a site in Maesteg, removal and disposal of the old equipment can be included and is itemised in the quote, so it is clear what is covered. If anything should be kept, such as a frame or motor that is still serviceable, we agree that at survey.

How long does installation take at a site in Maesteg?

It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.

Can a loading house be used for a cold store?

Yes. Loading houses suit chilled and frozen operations because the building door closes at the wall line, keeping the cold space sealed when no trailer is docked. The panels, door and shelter or seal are specified to suit the temperatures involved, which we confirm at survey.

Can a loading house be moved later?

Loading houses are bolted steel structures rather than masonry, so in principle they can be dismantled and moved if your needs change. In practice, relocation needs new foundations and an opening at the new position, so it is usually considered only where a house is fairly new and the new position suits it.

Loading houses near Maesteg

The same survey, quote and repair service is available in towns around Maesteg, such as Briton Ferry (7 miles), Neath (7 miles) and Bridgend (8 miles).

Other loading bay services in Maesteg

Full guide to loading houses · Everything we do in Maesteg

Ready to talk about a loading bay in Maesteg? Call us, or send the details through the quote form.

Call freeGet a quote