- Location
- Lutterworth, Leicestershire
- Main postcode district
- LE17
- Nearby (straight line)
- Rugby (6 miles), Hinckley (9 miles) and Earl Shilton (10 miles)
- Survey and quote
- Free, with a fixed written quote
A loading house is an insulated steel structure built against the outside wall of a building, containing a dock leveller and usually a shelter or seal at its front. The building door closes at the wall line, while trailers dock against the house. Loading houses suit buildings whose floor is at dock height but which have no room inside for a leveller pit.
Why do sites in Lutterworth choose this?
Chilled stores near Lutterworth sometimes favour loading houses because the building door closes at the wall line, keeping the cold envelope sealed when no trailer is docked. Manufacturing businesses around Lutterworth adding a dock to an existing building often find a loading house less disruptive than breaking out the slab inside.
Developers bringing forward industrial units in Lutterworth can specify loading houses at design stage, keeping the internal slab clear for whichever tenant takes the unit.
Your loading bay stays our responsibility from the survey to the handover. In Lutterworth, the survey and written quote are free, and the quoted price is fixed for the agreed scope. Installation is carried out by specialist engineers working under our management, at times planned with you to protect your loading schedule. Out-of-hours work is available by arrangement. We finish by testing the equipment and handing over its documentation.
Freight infrastructure is part of the background for sites near Lutterworth. In particular, Magna Park, one of the largest dedicated distribution parks in Europe, sits just outside the town near the M1 and M6. A bay matched to its vehicles keeps goods moving and people safe.
Can a loading house be added to an existing building?
Yes, loading houses are often added to existing buildings, provided the floor is at or near dock height and the wall can take a suitable opening. Adding docks without breaking out the floor is one of the main reasons operators choose them.
At survey we check:
- the floor height inside against the yard level outside;
- whether an existing door opening can be used, or a new one formed in the cladding or masonry;
- drains, ducts and other buried services where foundations will go;
- the space trailers need to manoeuvre, and whether an angled house would work better;
- any planning or building control approval the project may need.
Where the existing door is in good condition and suits the new layout, it can sometimes be kept. If your building has floors at yard level, a wider loading bay conversion may be the better route.
Does a loading house need planning permission or building approval?
A loading house can need planning permission, because it is a new external structure, so we check this at survey rather than assuming it is not needed. The answer depends on the site, the size of the house and any planning conditions already on the building.
Forming a new opening in the building wall is a structural alteration that may need approval. In England and Wales that means Building Regulations approval, in Scotland a building warrant, and in Northern Ireland building control approval.
Energy rules can also apply to the door in the building wall. In England, Approved Document L (2021) Volume 2 sets a limiting U-value of 1.3 W/m²K for vehicle access and similar large doors in new and replacement work. Wales, Scotland and Northern Ireland have their own energy rules, and we confirm the figure that applies to your nation and project.
The leveller inside the house is specified to BS EN 1398:2009, the dock leveller safety standard. Our guide to loading houses explained goes through the approvals in more detail.
The same published guide range applies across England; access, out-of-hours working and site conditions are confirmed at the free survey.
What does the free survey cover?
- Lighting inside trailers and at the dock face
- Control positions, isolators and any existing interlocks
- Age and condition of the equipment already in place
- Wind exposure at the dock, which affects door and shelter choice
- Temperature requirements for chilled, frozen or ambient goods
- Forklift and pallet truck loads crossing the leveller platform
Options to discuss
Angled loading house
Set at an angle to the wall so trailers approach on a diagonal, useful on narrow yards and sometimes allowing more bays to fit along a single elevation.
Shelter or seal front
A retractable or inflatable shelter, or a foam dock seal, across the front of the house, chosen to suit your trailers and how tightly the bay needs to seal.
What do the rules in England mean for the work?
Powered doors and dock equipment installed in England may carry the UKCA or the CE mark, and doors are covered by the product standard BS EN 13241. We hand over the relevant documentation for each item fitted in Lutterworth. Planning and Building Regulations questions are never assumed either way: we check what applies at survey, so you know before work is booked.
Questions about loading houses in Lutterworth
How long does installation take at a site in Lutterworth?
It depends on the equipment, the number of bays, the condition of the dock and whether any building or electrical work is needed. We agree a programme with you after the survey, setting out which bays are out of use and when. Larger jobs are usually phased so that part of the dock stays open, and out-of-hours working can be arranged.
Will you deal with building control and planning for a project in Lutterworth?
We check at survey whether the work is likely to need approval. Forming a new opening or dock pit may need Building Regulations approval, a building warrant or building control approval, depending on the nation, and external structures such as loading houses can need planning permission. Where approval is needed, we explain what is involved, work with your designer or agent, and build it into the programme.
Can you work outside our normal operating hours in Lutterworth?
Yes, by arrangement. Evening, night and weekend working can be planned so the installation causes as little disruption as possible to your loading schedule. Out-of-hours work can affect the price, so mention it at the survey and we will include it in the written quote. The agreed times are confirmed in the programme before the job starts.
How long does a loading house take to install?
The programme depends mainly on foundation works and manufacturing lead times, and we set it out in writing with the quote. On site, foundations must cure before the frame goes up, and the rest of the work follows in sequence. We agree dates with you so other bays can keep working.
Does a loading house need planning permission?
A loading house can need planning permission because it is a new external structure, and we check this at survey for every project. Forming a new opening in the wall may also need Building Regulations approval, a building warrant in Scotland or building control approval in Northern Ireland, depending on where the site is.
Loading houses near Lutterworth
Other towns within reach of Lutterworth on our coverage list include Rugby (6 miles), Hinckley (9 miles) and Earl Shilton (10 miles), all covered on the same terms.
Other loading bay services in Lutterworth
Full guide to loading houses · Everything we do in Lutterworth
Start your enquiry for Lutterworth through the quote tool. A few photos and approximate sizes help us respond with something useful.
